My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The last element of the plan is post-implementation monitoring to determine the effectiveness <br />of the plan. The overall result of the project is an estimated 77 percent reduction in external and <br />internal phosphorus loading to the lake. This will result in a reduction of Long Lake phosphorus <br />. . t t _ <br />concentration from 114 ;xg/l to 53 ;tg/l. This in turn will result in a reduction of lake <br />chlorophyil-a concentration to 15 ;ig/l and an increase in lake secchi depth to 1.6 meters. <br />The project is to be implemented over a six-year schedule. The total project cost is estimated <br />at S3.5 million. Major funding will be provided by the Minnehaha Creek Watershed District. <br />Grant funding will be requested for 40 percent of the project cost from the MPCA Clean Water <br />Partnership Program. The remaining local funding will be in-ldnd contributions from the DNR, <br />as well as the cities of Long Lake, Medina, and Orono. <br />vu <br />[
The URL can be used to link to this page
Your browser does not support the video tag.