My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section VII <br />Environmental Assessment Worksheet <br />An Environmental Assessment Worksheet (EAW) has been prepared for the project which <br />includes all four project segments, the wet detention basin/wetland south of County Road <br />No. 6; the wet detention basin/wetland at Deer Hill Road; the wet detention basin/wetland at <br />Long Lake Cit}' Park; and application of alum to Long Lake. <br />The environmental review process must be completed with a negative declaration in most <br />cases prior to the issuance of the permits from the individual agencies. However, the two <br />can be reviewed concurrently. The DNR definitely requires the EAW prior to issuance of <br />permits, however, the USCOE does not need EAW completion but does require cemrication <br />from the MPCA which may require that the E.AW process be complete. <br />.S:\01 gjyj^aBIM5i*ipuWT*A£5-lh
The URL can be used to link to this page
Your browser does not support the video tag.