My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section VI <br />Wetland Impacts and Mitigation <br />The overaU project wiU impact eristiag wedaods at the County Road No. 6 Site and the Deer <br />HiU Road site (See Appendix F for Wetland Delineation Reports). The project will also <br />create wetland habitat around the perimeter of wet detention basins at the above two sites and <br />in Long Lake Oty Park. The intention is to maximize wetland habiut around aU water <br />quality basins while still allowing for a design with significant deepwater habitat to meet <br />water quality treatment goals. <br />The various wetland impacts and mitigation areas are summarized in Table 1. As the above <br />table indicates, the proposed projects wiii convert 2.4 acres of existing upland to wetiand <br />fringe and/or deep water habitat. The projects wiil also provide significantly mote drverse <br />wetland systems than cutiendy exist and will include deep water habitat, submergent wetland <br />fringe, emergent wetland fringe and wooded wetland. <br />I <br />i
The URL can be used to link to this page
Your browser does not support the video tag.