My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
locations sumuoding th= to- A summary ot the proposed <br />mitigation is presented in Section VI. <br />T.C bas^ no. .edify e.sdn. hyd.uUcs or wa.r levels of the stream. T.e wet <br />detention basin has the foUowing design charactcnsncs: <br />• Normal pool elevation =« 964.3 <br />. Sunacc area at elevation 964.5 = 6.1 acres <br />• Maximum normal pool depth ® 10 <br />• Average depth » 7.3 feet <br />. Total normal pool volume - 44.6 acre-feet <br />. Side slopes = 8:1 (from eievadon 933 - 954.5) <br />.1 n-i „ six locations on the site. At each boring, continuous spUt spoon <br />“rito and Shelby mbe samples wem tahen at selected locadons and dep.s. <br />Based on the geotechnical information coUected. the soi. in die vic^,i of the proposed two <br />ceu basin are adequate to aUow for 8:1 basin sideslopes (See Appends B). <br />one SOU sample was composited to .30 feet to borings 0- <br />16 feet from boring DH-4. A second soU sample was composited from 0-20 feet fr <br />TIH 3 and DH-6 The samples were analyzed for the foUowing categones of <br />semivolanles. None of the above parameters were detected other than met^ compou <br />which were aU within normal background concentration ranges (See Appendix Q. <br />N:^0i
The URL can be used to link to this page
Your browser does not support the video tag.