My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-1987 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1987
>
02-17-1987 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2023 12:25:13 PM
Creation date
9/21/2023 9:33:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIVOTBS OP THS PIANNIIIG COMMISSION MBBTING HELD FEBRUARY 17, 1987 <br />ATTENDANCE 7:30 P.M. <br />The Orono Planning Commission met on the above date with <br />the following members present: Chairman Charles Kelley, <br />Maureen Bellows, Paul Taylor, Jim Hanson, Edward Cohen, <br />and Jeffrey Johnson. The following represented the City <br />staff: City Administrator Bernhardson, Building & Zoning <br />Administrator Mabusth, Assistant Planning & Zoning <br />Administrator Gaffron, and City Recorder Peterson. <br />CounciImember Goetten was also present. <br />Chairman Kelley introduced Edward Cohen and Jeffrey <br />Johnson as the two new Planning Commission members. He <br />also noted that there is one Urban vacancy on the <br />Planning Commission. <br />#1108 JAMBS a MART ANN HcGONAN <br />3175 JANBSTOMN ROAD <br />PRELIMINARY SUBDIVISION <br />PULBIC HEARING 7:31 - 7:40 <br />The Affidavit of Publication and Certificate! of Mailing <br />was noted. <br />Mary Ann McGowan was present for this matter. <br />Assistant Zoning Administrator Gaffron explained the <br />request to subdivide a 5.2 acre lot (Lot 1, Block 1, <br />Liberty Acres) into 2 lots of 3.19 acres and 2.01 acres. <br />He noted that applicant has submitted the additional <br />drainfield information and the septic testing for both <br />lots. The applicant proposes a 15' drainageway, however <br />staff feels it should be 20' because of the slope of the <br />banks, recommending the City Engineer review this and <br />give a final recommendation He noted that Lot A as <br />proposed requires a varian. o lot width at the 50* <br />setback line (approximately xu8' width proposed, 200* <br />required, noting that the width of the lot exceeds 200* <br />at the existing house location ); and both Lots A and B <br />require a variance for frontage only on a private road. <br />Bellows noted that on the survey a portion of the <br />existing driveway to the existing house on Lot A was on <br />Lot B which she recommended be corrected to be entirely <br />on Lot A. <br />Planning Commission concurred with Bellows* <br />recommendation. <br />Assistant Zoning Administrator Gaffron reviewed staff*s <br />recommended conditions of approval. <br />No one was present from the public regarding this matter <br />and the public hearing was closed.
The URL can be used to link to this page
Your browser does not support the video tag.