Laserfiche WebLink
MIIU^ OF fm FLAimiHG COWaSSlOH MBBTIBG HELD JaHUaR? 20» 1987 <br />#1097 VAN BBCKHOUT BLDG. CORP. CONTIHUED <br />Planning Commission felt the cost involved should be the <br />applicant's responsibility. <br />It was moved by Chairman Kelley, seconded by Taylor, to <br />recommend approval of the lot line rearrangement at <br />2020/2080 Salem Court, vacation of drainage and utility <br />easement and creation of new drainage and utility <br />easement along the property line as proposed, further <br />with the condition that the current utilities on 2020 <br />Salem Court serving 2080 Salem Court be relocated within <br />the property they serve. Motion, Ayes 4, Nays 0. <br />#1096 J. VOGT AMD H. BILBBLIHK <br />95/175 WATERTOWN ROAD <br />SUBDIVISION <br />PUBLIC BEARING 7:45 ~ 8:04 <br />The Affidavit of Publication and Certificate of Mailing <br />was noted. <br />Mike Hilbelink and John Vogt were present for this <br />matter. <br />Zoning Administrator Mabusth explained the proposed <br />subdivision involves the replat of Lots 2 and 3 Peterman <br />Addition which was approved by the City 11/10/86. The <br />new proposal involves the creation of 4 additional lots <br />with total development at 6 lots. Each lot satisfies <br />the area and width standards. There are no existing <br />structures on the property. She noted that drainage is <br />an important issue in this matter. She noted that City <br />Engineer Cook recommends that a drainage ditch be <br />installed along the west lot lines of Lots 1 and 2 in <br />order to prevent drainage from east to drain into <br />adjacent property. Cook asks that the drainage ditch be <br />defined along Lots 1 and 2 prior to lot development and <br />that as lots to the north are developed any drainage to <br />west be channeled to drainage ditch along west lot <br />lines. She noted that all the lots meet the standards <br />and are suitable for primary and alternate on-site <br />septic systems. <br />Bill Wear stated that he felt the entire drainage ditch <br />should be constructed at this time. <br />Mr. Hilbelink felt that the development of the lots <br />v/ould not affect the drainage pattern that has existed <br />for many years. <br />Joe Sawchuk stated he felt the drainage should be <br />designed for the future and carried out along the entire <br />subdivision.