My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-1988 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1988
>
05-19-1988 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 4:28:42 PM
Creation date
9/14/2023 4:11:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />MIHDTBS OF *BB FIAmilSS COMUSSIOH !TU6 1 lOil 1«, 19f8 <br />#1263 m JCD mUKl/RlVDS COWTIUBP <br />Kelley felt that a crosswalk should be designated across <br />the County Road. <br />d ’■r. <br />* '% su <br />it was Boved by Kelley* seconded by Brown* to recoionend <br />approval of the following: <br />1. Setback along street variance as proposed. <br />2. Variance for four parking spaces. <br />3. Hardcover variances on both the Tanager Lake side <br />and Browns Bay side as proposed. <br />4. Lakeshore setback variance as proposed. <br />5. Allow coBBercial activity within 50' of <br />residential district. <br />6. Lot area and lot width variances. Hardship based <br />on the existing current structure. <br />7. Variances for lakeshore* side yard* and front <br />landscaping along the parking lots along County Road <br />15* however allowing 10' landscaping in front of the <br />building. <br />8. Variance to allow crushed rock surface instead of <br />asphalt. <br />Subject to the findings outlined in staff's memo and the <br />following conditions: <br />1. Hydraulic volume information on the east and west <br />side. <br />2. Feasibility of a designated crosswalk. <br />Finding the hardship is the shape and sise of the <br />existing commercially used property. <br />Bellows suggested that a fence be placed in lieu of the <br />waived landscaping. <br />Jacobs felt that a fence would obstruct sightlines etc. <br />Mr. Rivers explained his intentions for landscaping if <br />he gets the 10* right-of-way from the County. <br />Motion* Ayes 5* Nays 0. <br />Jacobs reviewed the commercial site plan. He noted that <br />the building size has been reduced. <br />Bellows questioned the need for 3 years to accomplish <br />the project and felt a specific time period should be <br />determined. <br />Mr. Rivers explained that he plans to do the Tanager <br />Lake side improvements this summer* and complete the <br />other side when financing is available. <br />Bgiwiei
The URL can be used to link to this page
Your browser does not support the video tag.