My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
09-16-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:51:54 AM
Creation date
9/14/2023 11:48:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />\ffiETING HELD ON AUGUST 19.1996 <br />(#11 - #2167 Allen and Judy Schefcrs - Continued) <br />Gaffron noted the elusiveness of the application with the steady stream of changes made <br />from the original proposal He reported that the original house was planned within the <br />flood plain and with the lowest floor level below the Regulatory Flo<^ Protection <br />Elevation (RFPE) The 75-250' hardcover was also proposed at about 32% where only <br />25% is allowed The lot is vacant, and a new house is now proposed for which there is no <br />justification for hardcover variances. The house has now been raised to the required <br />935.5’ elevation and out of the flood plain With the changes to the location, the size of <br />the house, and the driveway, the house now will meet the 25® o hardcover The only <br />request remaining is for a CLT* for fill importation in excess of 100 cubic yards It would <br />require 300-400 cubic yards of fill for this proposal Gaffron noted there is also no <br />defined average lakeshore setback to meet as there is no house to the south. The house <br />will be located some distance back from the 0-75' setback The hardcover in the 75-250' <br />setback is proposed at 24 97®/o Gaflron said the plan is realistic He said the fill would <br />require around 30 truck loads. Documentation by a survey showing hardcover <br />calculations will be required <br />Peterson noted that the normal precautions would be required regarding fill such as road <br />clean up. <br />Smith moved, Lindquist seconded, to approve the request for a CUP for fill in excess of <br />100 cubic yards with the inclusion of a surv ey. Vote Ayes 5, Nays 0. Hawn was absent <br />from the vote <br />PLANNING COMMISSION COMMENTS <br />(#12) REPORT OF PLANNING COMMISSION REPRESENTATIVE <br />ATTENDING COUNCIL MEETING OF AUGUST 12.1996 <br />No report was given <br />(#13) PLANNING COMMISSION APPROVAL OF MINUTES OF THE JULY 22, <br />1996 MEETING <br />Lindquist moved, Peterson seconded, to approve the Minutes of the Planning Commission <br />Meeting of July 22, 1996. Vote; Ayes 5, Nays 0. Hawn was not present for the vote. <br />(#14) PLANNING COMMISSION TO SELECT A REPRESENTATIVE TO <br />ATTEND THE COUNCIL MEETING OF SEPTEMBER 9.1996 <br />Stoddard will attend the September 9, 1996 meeting of the Council
The URL can be used to link to this page
Your browser does not support the video tag.