My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
09-16-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:51:54 AM
Creation date
9/14/2023 11:48:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO FLAMMING COMNflSSION <br />MEETING HELD ON AUGUST 19, 1996 <br />(#10 - #2166 Janet Kieman - Continued) <br />Stoddard asked where the City was regarding the County's planned improvements to <br />CoRd 15. Callahan said it in a state of active consideration noting the different <br />viewpoints taken amongst Council members <br />Lindquist asked for the size of the patio to be considered Kieman asked that it be large <br />enough to accommodate a table and chairs Stratton said it is currently proposed at 24' <br />across and 18' out from the house Gaffron reviewed the hardcover in the 0-75' setback <br />and suggested cutting the size of the patio in halt. Kieman and Stratton agreed to limit the <br />Me of the patio to 240 s f <br />Smith asked about the plan for the gazebo Kieman said she would like to do it in the <br />future. The placement was unknown, but Kieman was informed that it should not <br />encroach the septic system drainfield <br />Hawn moved. Smith seconded, to approve Application #2166 with the following changes <br />and conditions; The garage will be offset with a minimum of 1 5' setback from CoRd 15. <br />TiKr patio will be reduced in size to 240 s f The property will not be allowed to have <br />more than 4 bedrooms until such time as sewering is complete. The Planning Commission <br />advised that no more structural coverage would be allowed in the 0-75' setback zone as <br />the property has reached its maximum limit. <br />Gaffron noted that the change in hardcover in the 0-75' setback would result in a 3.9% <br />variance He also informed the applicant that the drainage and grading plans and location <br />of the sewer would be required before the application would go before the Council. <br />Gaffron said he would provide what information they had in-house, and this request <br />should not hold back the proposal <br />Vote Ayes 5, Nays 1, Peterson, principle of average lakeshore setback, concern with <br />trading a fireplace and minor landscaping for major structure in the 0-75' setback, and <br />noted the property was at the point of no additional structural coverage. <br />(#11) #2167 ALLEN AND JUDY SCHEFERS, •'2540" CASCO POINT ROAD - <br />VARIANCES - PUBLIC HEARING 10:03-10:08 P.M. <br />The Affidavit of Publication and Certificate of Mailing were noted. <br />The Applicant was represented by Loren Brueggeroann.
The URL can be used to link to this page
Your browser does not support the video tag.