My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-1996 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1996
>
03-18-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2023 2:48:07 PM
Creation date
9/7/2023 2:42:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*>'■ <br />Zoning File #2121 <br />March 11,1996 <br />Page 4 <br />C. Wetland to be designated per directives of City staff or applicant has the option to <br />hire a wetlands delineator to determine the exact boundaries of the wetland. The City <br />will make its determination from the designated wetland map and topogn^hic maps. <br />A drainage easement shall be taken over the designated wetland. <br />2.Basement elevations for new construction should not be below 951 elevation ia order to <br />allow for adequate clearance below footing and grade of the sewer service pipe. <br />j.Erosion control shall be maintained during construction in order to protect designated <br />wetland. A 26’ setback must be maintained for all construction activities involving filling <br />and grading. All structures must also meet the 26' setback. <br />4.An additional sewer payment of S350 is required to be paid with building permit for either <br />Tract B or Tract C. <br />—•- —'i •
The URL can be used to link to this page
Your browser does not support the video tag.