My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
04-15-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2023 2:48:16 PM
Creation date
9/7/2023 2:42:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #2128 <br />April 12, 1996 <br />Page 6 <br />metering the down stream areas to determine what improvements, if any, will be needed. This will <br />probably not be accomplished until mid-May. Staff notes that intense use of the ice hockey facility <br />is in the winter months when I & I is not of issue. The City has set aside funds for the upgrading of <br />down stream facilities based on the original Comp Plan Amendment No. 2 (1987) improvements <br />proposed for the Highway 12 area. The City will work with Long Lake to make the necessary <br />improvement by a reasonable date. Applicant's architect shall be responsible for presenting final <br />construction plans to the appropriate agency of the Metropolitan Council to determine the exact <br />number of SAC units. Applicant shall be charged sewer and water units based on the number of <br />SAC units. Based on 1996 fee schedule combined sewer unit and water unit charge will be <br />$8,525.00. <br />Landscaping/F encing/Signage/Exterior Lighting <br />The landscaping plan has been found to be adequate. The applicant will be working with the <br />property owner to the immediate west to select location of additional plantings. A neighbor in <br />attendance at one of the informational meetings noted that the allotment of $29,000 for plantings of <br />this scale is not realistic. Applicant may have to phase the planting schedule over a two to three year <br />period. <br />Signage information has not been provided but applicant's signage is limited to 12 s.f. If they seek <br />additional area, they must advise staff before the application is scheduled before the Council so that <br />signage area variance can be determined. <br />It is not clear whether Exhibit R, shows the location of exterior lights on the property. Applicant <br />should advise as to the location and type of lighting to be used. Lighting must be shielded <br />downward away from residential boundaries and public roadway. <br />Operating Board <br />The facility will be operated by a Board of Directors consisting of five members, three shall be <br />appointed by the Orono Hockey Boosters. Applicant proposes that the School District appoint the <br />two remaining Board members in an attempt to establish an official property owner liaison position. <br />The Board, in turn, will hire a professional arena manager or management firm to maintain the <br />facility. During the heav'y use months of the winter season, the facility will be operated firom 5.30 <br />a.m. through 11:30 p.m. The applicant has provided no information on the off season hours of use. <br />Review Exhibit B, applicant's addendum specifically page 3, off season uses are reviewed as <br />follows: <br />School District <br />Educational activities for school productions, meetings, affairs or other flmd raisers <br />and may also serve as classrooms.
The URL can be used to link to this page
Your browser does not support the video tag.