Laserfiche WebLink
Schoell Sl Madson, Inc. <br />Eng/nesrs • Surveyors • Planners <br />Soil Testing • Environmental Services <br />105S0 Wayzata Boulevard. Suite 1 Minnetonka. MN 55305-1525 <br />Office 612-54B-'7B01 Pax B1 2-5«4B-SQB5 <br />B <br />October 6, 1997 <br />Mr. Mike Gaffron <br />City of Orono <br />P. O. Box 66 <br />Crystal Bay. MN 55323 <br />Subject:Garden Lane Site <br />LGA Investment Group. Inc, <br />Dear Mike: <br />Enclosed are the following items related to LGA’s Garden Lane Site subdivision <br />proposal: <br />1. Three sets of full size revised preliminary plans <br />2. One set of 11" x 17" revised preliminary plans <br />3. One copy of wetland delineation report <br />The plan revisions. In general, are those required to address the city staff <br />recommendations on the previous plans. This resulted in the reduction of one lot. <br />Vacation of existing Garden Lane right of way is no longer required. The storm water <br />pond is sized to comply with Minnehaha Creek Watershed District standards. The <br />watershed permit application will be made after preliminary plat approval Is obtained <br />from Orono. The necessary detailed drainage calculations will be submitted at that <br />time. <br />The plans also show the existing wetlands on the site. These are described In <br />the report. We initially felt no wetlands were present, but a closer investigation showed <br />wetlands exist along the drainage ditch and north ravine, and another basin (No. 1) on <br />lot 5. Wetland basin 2 will be altered by the storm water basin construction. Basin 1 on <br />lot 5 will be altered by the proposed house construction. It should be noted that even If <br />Basin 1 was not impacted by the proposed house construction, it would still be <br />impacted because the majority of the surface runoff to this wetland will be diverted to <br />the north ravine as requested by city staff. <br />©iM’yy UO Q/ears c9rerutcc <br />' Affirmative Action Equal Opportunity Employer