Laserfiche WebLink
w <br />SchoBlI Si rs/ladson, Inc. <br />Engineers • Surveyors • Planners <br />Son Tosting • Environmental Services <br />105B0 Wayzata Boulp«/arcl. Suite 1 <br />Office 612-546-7B01 <br />Octobers. 1997 <br />E <br />Mr. Mike Gaffron <br />City of Orono <br />P. O. Box 66 <br />Crystal Bay, MN 55323 <br />Subject:Garden Lane Site <br />LGA Investment Group, Inc. <br />Dear Mike: <br />Enclosed are the following items related to LGA’s Garden Lane Site subdivision <br />proposal: <br />1 . Three sets of full size revised preliminary plans <br />2. One set of 11" x 17" revised preliminary plans <br />3. One copy of wetland delineation report <br />The olan revisions, in general, are those required to address the city staff <br />recomS'ons on the previous plans. This resulted in the reduction of one lot <br />Vacation of existing Garden Lane right of way is no longer required. The storrn wa <br />Dond is sized to comply with Minnehaha Creek Watershed District . <br />watershed permit application will be made after preliminary plat . <br />from Orono^ The necessary detailed drainage calculations will be submitted at that <br />time. <br />The plans also show the existing wetlands on the site These <br />the report We initially felt no wetlands were present, but a °Nn on <br />LiPtlai5ds exist along the drainage ditch and north ravine, and another basin (No. 1) on <br />lot 5. wetland basin 2 will be altered by the atom, water <br />lot 5 will be a«erS by the proposed house construction. It should be not^ that even rf <br />bLi* ^s n^^ tt-e proposed house construction, it w°u« st,« be <br />frnpTcte*bl.^uJ^tt.e majority of the surface runoff to this wetland will be dwerted to <br />the north ravine as requested by city staff. <br />©mr ^0 n/ears of &cyi>ioe <br />Affirmative Action Equal Opportunity Employer <br />Bar