My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-15-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
09-15-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:10:36 AM
Creation date
9/6/2023 10:01:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
minutes of the orono planning commission meeting held on may 19.1997(#16 - #2239 Tun Waters - Continued) <br />P"Tut‘the <br />iSdhion .0 coonecion Ctog«. SIrSIS <br />iL bL suggested as a way to solve *e Hennessey lot problem. <br />McMlUan asked that the sketch plan be reviewed by the Park Commissioa <br />Gaffion was informed that dte Planning Commission had no concerns with the subd'.vision <br />as proposed. <br />(«7) #2240 JIM WATERS, LGA KVESTMENT GROUP, INC, WILDHURST <br />T^V - SUBDIVISION/SKETCH PLAN REVIEW <br />Tim Waters was present. <br />Gaf&on reponed that tins proposal includes three groupr <br />slopes. <br />Gaaon mdicated that the lots generally meet the 200 ’ lot width <br />n\nn At an averaee of 1-1/2 acre lots, this would place a large number of homes <br />“r^et h^r^e no. previously b;en located. They would also be located near dte <br />park land and might possibly change the naUire of the park.
The URL can be used to link to this page
Your browser does not support the video tag.