Laserfiche WebLink
Planning Commissioners/August 14, 1997/p.2 <br />Both times we have come before the Planning Commission (1991 and now), Ljmtan <br />Avenue seems to be to major point of concern. Feelings range from “slightly <br />uncomfortable to highly hostile” to the road we all call home With that in mind, we tried <br />to do what we could, w ithin our property limits to alleviate some of the concerns We <br />moved the drive into the property (Outlot B) to the west side of the property, w hich <br />allows most of the new traffic to have direct access to the public right-of-way on Lyman <br />and not onto the private road The outlot includes a cul-de-sac w hich both staff and <br />Planning Commission Members wanted for ease of tum-around for fire trucks and plowing <br />equipment Another cul-de-sac could be created at the end of Lyman when the <br />Department of Transportation takes one of the houses at the end for the Highway 12 <br />upgrade. Three quarters of the land needed for that cul-de-sac at the end of Lyman has <br />already been dedicated <br />To comply with your concerns about the width of Lyman, we are dedicating a portion of <br />our property (Outlot A) to allow space to widen Lyman Avenue, and without a need to <br />place any additional fill to the southeast side of the road This will allow some flattening <br />of the famous curve and improve sight lines Bonestroo, Rosene, .Anderlik & Associates <br />stated in their report on the subdivision (June 11, 1997) that “a 20-foot paved surface may <br />be an acceptable access ” Widening Lyman will take away concerns about the access to <br />and from Lot 4 The sewer project will allow an opportunity to both build the sewer and <br />upgrade Lyman from Smith (now 12-15 feet wide in the public part of the road) and then <br />assess the benefiting property owners. <br />Unfortunately, complying with your request to provide a cul-de-sac within the property <br />and load new traffic on the public part of Lyman (Outlot B) eliminates the second septic <br />system site for lot 4. The site that meets Orono’s septic system design requirements is <br />under the cul-de-sac. We are hoping that you will take into consideration the fact that we <br />are trying to do those things that will alleviate your concerns for safety on Lyman and that <br />you will grant us Lot 4 as a buildable lot with only one septic site, knowing that public <br />sewer will abut that lot within one or two years and be available for hookup should the <br />primary system fail. <br />Someone raised the question about our current house being served by a driveway not <br />entirely on our property. We do have a formal easement across the property we do not <br />own for the existing driveway, signed and registered with Hennepin County, as Document <br />#1203061, which was filed on December 15, 1976. Although the driveway could be <br />moved onto our property and we have shown this design on the proposal, it will <br />necessitate the removal of a large number of large trees. It has existed for 30 years in its <br />current spot without any traffic incidents at its egress. The vacated driveway would be a <br />large scar in the landscape for many years to come. I hope some of you will have the <br />chance to look at the two locations and then decide the best approach <br />I