My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-1979 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1997
>
08-18-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 9:27:35 AM
Creation date
9/6/2023 9:20:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACY AND MARC WHITEHEAD <br />1220 Lyman Avenue <br />Wayzata,MN 55391 <br />473-8278 <br />August 14, 1997 <br />'DECEIVED <br />AUG 1 5 1997 <br />wii • Ur ORONO <br />To the Members of the Planning Commission <br />Lots 20-36; Orono Orchards <br />Enclosed with your packet today is a Subdivision Application for the property we have <br />owned and lived on for almost 30 years Marc accepted a position in Chicago and it is <br />with very mixed emotions that we leave our friends and community. This is not something <br />we had expected at this stage of our lives. But with the demise of the law firm of which <br />he was a member for 33 years, we had no choice. <br />In revising the subdivision plan, we tried to listen and heed the thoughts that many of you <br />expressed at your last meeting We heard that you were concerned about the lack of a <br />cul-de-sac, that you worried about loading additional traffic after the curve on Lyman, <br />that you wondered about widening Lyman sometime in the future, that you wanted a <br />wetland delineation to verify all wetlands on the site, and that you weren’t sure if the third <br />acre for back lots niust be dry buildable or not. <br />I also met with Mike GafFron a number of times as I went through the process with our <br />septic system, surveying, engineering, and wetland experts. He went over the variances <br />that would be required for our first proposal, patiently explained ail of the setback <br />requirements, clarified Orono’s wetland map, and even helped me figure out which were <br />the front, rear, and side lotlines for the different lots. We also discussed the fact that <br />public sewer serv ice w ill be installed on Smith and part of Lyman, probably within the next <br />two years I’m sure it is not easy for staff to deal with a novice developer, but Mike took <br />it in stride. None of my questions were “too dumb.” <br />In addition, I reviewed the staff recommendations of the proposal we submitted in 1991, <br />as Mike felt that some of them were still relevant today. I also met with two staff <br />members of the Minnehaha Creek Watershed District to review their requirements. <br />With all of this in mind, our team spent many days and hours trying to develop a proposal <br />that would meet Orono’s codes, address your comments, and keep the spirit of our land <br />and neighborhood intact.
The URL can be used to link to this page
Your browser does not support the video tag.