Laserfiche WebLink
ITEM UNIT EST.QUAN UMTpncEHmCATION CONSTRUCTIONSTORMWATER DETENTION BASIN CONSTRUCTION (112 ACRE) FLOOD PLAIN MITIGATION CONSTRUCTION (TOWN ROAD)DNR WETLAND MITIGATION CONSTRUCTION (TOWN ROAD) WCA WETLAND MITIGATION CONSTRUCTIONSUBTOTAL MITIGATION CONSTRUCTION <br />REMAINING CONSTRUCTION ITEMS <br />SUBTOTAL REMAINING CONSTRUCTION ITEMS <br />TOTAL CONSTRUCTION ITEM COST <br />PLUS ENGINEERING <br />RIGHT OF WAY ESTIMATE <br />, Jj/f STORMWATER DETENTION BASIN - ORONO 0 84 ACRE-FT . WAY2ATA 0 28 ACRE-FT <br />Ylt Kffl <■ FLOODPLAIN MITIGATION tBAOter CUTOFF IS A POSSIBLE SITE ) <br />DNR WETLAND MITIGATION - ORONO 1 214 ACRE. WAY2ATA 0 01 ACRE <br />WCA WETLAND MITIGATION - ORONO 0 98 ACRE. WAYZATA 0 08 ACRE <br />PERMANENTH^EMPORARY EASEMENTS <br />TOTAL RIGHT OF WAY COST <br />TOTAL PROJECT COST <br />TOTAL mmmpmESTNNATEOOHOHOcommrCOST%i COST %! . COST22.400 00 1 ^0 00 u»22.4000020,000 00 (3)000 100 20.000 0010.000 00 1 W.000 100 10.000 00000i (7)000 100 0 0052.400 00 000 52.400 30 <br />j 1.683 282 00 1 0 1 100 ,1.683.282 00 <br />1.683282 00 0.00 1.683^2-00 <br />$2,166.400 00 $37,809.00 $1,914,591.00 <br />8.800 00 (8) <br />43.00000 (5)16,87500 28.125 00 <br />13.00000 W 7,50000 7,500 00 <br />119.984 00 <4)50.49200 60.472 00 <br />000 (7)000 000 <br />170.000 00*t«) 1 77.50000 92,500 00 <br />$349,964.00 $161,367.00 $188,597.00 <br />$2,516,364.00 $205,982.00 $2,103,186.00 <br />(1) METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES IS UNDER SEPERATE AGREEMENT. <br />(2) *20.000 PER ACRE-FT OF DEAD POND STORAGE IS REQUIRED FOR CONSTRUCTION OF BASIN. WITH FUNDING 100% HENN CO. <br />(3) COST PARTICIPATION TO MITIGATE THE IMPACTED FLOOD PLAIN AT A 1 1 RATIO FOR CONST ITEMS IS 100% HENN. CO . 0% MUNICIPAL <br />PROPERTY ACQUISITION IS 50% HENN CO AND 50% MUNICIPAL <br />(4) COST PARTICIPATION TO MITIGATE DNR WETLANDS AT A 1 5 1 RATIO FOR CONST ITEMS IS 100% HENN CO . 0% MUNICIPAL <br />PROPERTY ACQUISITION IS 50% HENN CO , 50% MUNICIPAL BASED ON PERCENTAGE MUNICIPAL IMPACT AS COMPARED TO THE TOTAL PROJECT IMPACTS. <br />(5) COST PARTICIPATION FOR A DETENTION BASIN IS 50% HENN CO AND 50% MUNICIPAL BASED ON THE PROPERTY ACQUISITION NECESSARY TO CONST <br />A BASIN TO ACCOMODATE THE MUNICIPALITIES DEAD POND STORAGE REQUIRED AS COMPARED TO THE TOTAL PROJECT DEAD POND REQUIREMENTS <br />(6) COST PARTICIPATION FOR PERMANENT AND TEMPORARY EASEMENTS IS 50% HENN CO . 50% MUNICIPAL BASED ON ACQUISITIONS OCCURING IN THE MUNICIPALITY. <br />(7) ENTIRE COST FOR WCA WETLAND MITIGATION IS FUNDED BY BOARD OF WATER AND SOIL RESOURCES <br />(8) 18% FOR DESIGN AND CONTRACT ADMINISTRATION <br />(9) 10% FOR CONTRACT ADMINISTRATION. <br />» 1 CQ?T <br />% <br />$214,000.00 <br />21.400.00 (9) <br />: <br />$235,400.00 <br />HENNEPIN COUNT! AGREEMENT NO. PW 52-08-96 <br />EXHIBIT "A" SHEET 2 OF 2