Laserfiche WebLink
DIVISION OP COST SUMART HENM. CO. PROJ. 9222 CSAH 15ITEMimiTI EST.I QUAIi TOTAL I OMIT I ESTIMATED ;COST jPRICE !ORONOCOST HENNEPINCOUNTY1COST MCES (1)» 1 .. cost; <br />ROADWAY CONSTRUCTION ITEMS <br />CONCRETE CURB A GUTTER. DESIGN 0424 <br />CONCRETE CURB S GUTTER. DESIGN B424 <br />CONCRETE CURB & GUTTER. DESIGN B624 <br />m 1 84 35 00 2.640 00 50 1.470.00,50 1.470 00 <br />m 600 30 00 18.000 00 50 9.000 00 50 9.000 00 <br />m 466 30 00 13.980 00 50 6.990 00 50 6,900 00 <br />SUBTOTAL ROADWAY CONSTRUCTION ITEMS 34.S20.00 17,460.00 17.460.00 4 <br />PRO^TA ITEMS <br />MOBILIZATION LUMP SUM <br />1 <br />ii <br />i 11 36.00000i 36.000 00 2 72000 96 35,280 001 <br />FIELD OFFICE TYPE 0 EACH 1 8.000 00 8.000 00 2 160 00 98 7.840 00 <br />1 <br />FIELD LABORATORY TYPE 0 EACH 1 6.000 00 8.000 00 2 120 00 98 5.860.00TRAFFIC CONTROL EACH 1 70.000.00 70.000 00 2 1.400 00 98 68,600 00 <br />i <br />SUBTOTAL PRO-RATA ITEMS 120.000 00 2.400.00 117.600 00 <br />STORM SEWER <br />• <br />1 <br />100mm PERFORATED THERMOPUSTIC PIPE m 1050 20 00 21.000 00 0 000 100 21.000 00 <br />37Smm RC PIPE APRON/TRASH GAURO EACH 1 11 400 00 4.400 00;SO 2.200 00 50 2.200 00 <br />1 <br />i <br />300mm RC PIPE SEWER <br />i m 47 5 80 00.3.SOOOO|0 000 100 3.80000 •* 1 <br />375mm RC PIPE SEWER j m ;211 7*90 00‘19.053 001 50 11 9.52650 50 9.526 50 <br />CONST DRAINAGE STRUCTURE DESIGN G l m 20!550 00 1.100 oo;0 000 100 1.100 00 <br />CONST DRAINAGE STRUCTURE DESIGN N m 1 139i 550 00 7,645 00'50 3.822 50 3,82250 <br />CASTING ASSEMBLIES <br />1 EACH 1 16!300 00 4.800 00'50 2.400 00 50 2.400 00 <br />t <br />SUBTOTAL STORM SEWER 61.706 00 17.94900 43«849.00 \ <br />MCES SANITARY SEWER CONSTRUCTION LUMP SUM i!214.000 00 214.000 00|0 -000 0 0.001 100 I_ 214.000 001 <br />SUBTOTAL MCES SANITARY SEWER CONSTRUCTION 214.000.00 COO 0.00 214.000.00 <br />HENNEPIN COUNTY AGREEMENT NO. PH 52-08-96 <br />EXHIBIT "A" SHEET 1 OF 2