Laserfiche WebLink
1/1 Bonestroo <br />Rosene <br />m Andcrlik &. <br />Associates <br />Engineers & Architects <br />January 5, 1995 <br />Ms. Jeanne A. Mabusth, <br />Building and Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Bonestroo. Rosene. Anderiik end Associates, me is an Affirmative Action^ Equal Opportunity Employer <br />Otto C Bof>estroo. P £ <br />Robert W Rosene PE • <br />Joseph C Andeflik. P E <br />Marvin L Sorvaia. P E <br />Rich^d E Turner. P E <br />Gienn R Cook. P E <br />Thomas E Noyes. P E <br />Robert G Schunicht, PE <br />Susan M Eber lin CPA* <br />* Senior Consultant <br />Howard A Sanford. PE <br />Keith A Gordon.. PE <br />Robert R Pfefferie PE <br />Richard 'Ji/ Foster. P E <br />Oavid O Loskota PE <br />Robert C Russek. AIA <br />Jerry A Bourdon. PE <br />Mark A Har^son. P£ <br />Michael T Rautmarm. PE <br />Ted K Field. P E <br />Thomas R Anderson. AI A <br />James R Rosenmarket. PE <br />Donald C B ifgarcst. P E <br />Thomas A Syfko. PE <br />Frederic J Sienborg. P E <br />tsmaei Martinet. P E <br />Michael P Rau. P E <br />Thomas Sfr Peterson. P.|. <br />Michael C lynch. P E <br />James R Maiand, P E <br />Jerry D Fertiich, P E <br />Scott J Arganek. PE <br />Kenneth P Andersoa PE <br />Mark R Rolfs. P.E <br />Mark A Seip. P E <br />Gary W Mofien PE <br />Paul J Gannon. A t A <br />Daniel J Edgerton. P E. <br />A Rick Schmidt. P £ <br />Dale A Grove P E <br />Philip J Caswell. P E <br />Mark 0 Wallis. P E <br />Miles B Jensen. P E <br />L Phillip Gravel. P E <br />Karen L Wiemeri. P E <br />Gary D Krisiofiu. PJ. <br />Brian K Gage. P E <br />F Todd Foster. P E <br />Keith R Yapp. PE <br />Douglas J Benoit. P£ <br />Shawn D Gustafson. P.E. <br />Cecillo Olivier, P E <br />Kent J Wagner. P E. <br />Paul G Heuer, P E <br />John P Gorder. P E <br />Dan O. Boyum. P.E. <br />Jeffrey J Ehieringer. P i. <br />Joseph R Rhein. P E <br />Lee M Mann. P E <br />Charles A. Erickson <br />Leo M Paweisky <br />Hartan M Olson <br />Agnes M Ring <br />James F Engeihardt <br />Crystal Bay, Minnesota 55323 <br />Re; Orono Ice Arena <br />File No. 139-2103 <br />Dear Jeanne, <br />'JAN S 1996 <br />A • <br />I t <br />. V <br />• * <br />it ^ <br />We have reviewed the schematic design for the proposed Orono Ice Arena located west of <br />Old Crystal Bay Road and south of CSAH 6 in the southwest quarter of Section 28. There <br />are several issues that need to be addressed relative to engineering matters, and added to <br />the plan set. <br />Both sanitary sewer and water main will need to be extended north along Old Crystal Bay <br />Road for service, assuming that the City ’s Comprehensive Plan amendment is approved by <br />the Metropolitan Council. Due to the elevation of the site, wastewater should be pumped <br />from a grinder pumping station through forcemain to the existing gravity sewer. An 8-inch <br />DIP water main should be extended from the existing water main to the northwest corner <br />of the site for a future connection to the City of Medina ’s water system. A 6-inch service <br />line and hydrant should be extended within the site. We do not recommend 4-inch copper <br />for the domestic water piping due to the high cost. Plans and specifications should be <br />prepared for the sanitary sew’er and water main extensions, with as-built plans provided to <br />the City' upon completion. The existing sanitary sewer and water main are located <br />approximately 400 and 1100 feet south of the property', respectively (see Record Plan A132). <br />There are two wetlands on the site which have been delineated. The wetlands are regulated <br />by the Minnehaha Creek Watershed District (MCWD) at the State level as part of the <br />\Vetland Conservation Act (WCA), and under the jurisdiction of the U.S. Army Corps of <br />Engineers (COE) at the Federal level. It appears that both wetland areas may meet the <br />requirements for a WCA exemption. The applicant should obtain such exemptions or <br />permits that may be necessary from the MCWD and C DE for filling or draining the wetland <br />areas. <br />The proposed drainage on the site is directed northeasterly through a proposed stormwater <br />pond to an existing culvert. This concept is acceptable. Drainage and ponding calculations <br />should be provided for our review. We recommend that some type of skimmer structure <br />be included at the pond outlet. A detail of the outlet structure and pond elevations should <br />2335 West Highway 36 ■ St. Paul, MN 55113 ■ 612-636*4600