Laserfiche WebLink
MINUTES OF THE REGUT-\R ORONO CITY COUNCIL <br />MEETING HELD ON SEPTEMBER 11,1995 <br />CitO . ;*2051 Michael Hiibelink/John Vogt - Continued) <br />M-^h-sth said there is an issue of m*o drain outlets on the east side of the property by the <br />Peterman Addition and direaed along the lot line to Old Crystal Lay Road. The outlets <br />serve no function and can be closed according to the Engineer. <br />The access for three lots %viU be sen-ed by private road, vv-ith lot 4 to the south by e.'dsting <br />curb cut that sen ed the original house, it was noted that if a new road were put in on <br />the east side, it would create 4 thru lots in the Peterman addition and j thru lots in i e <br />current proposal wnth a lot surrounded on three sides by a road. It was determined to e <br />best served by an internal road, one reason of which to move around the forested area. <br />Hurr asked about two a.'-emate septic sites shown in a stand of trees. Hilbelink said a <br />secondarv. site was m the stand of trees with the principal, halt m and half out. He noted <br />that if a road were to be located to the east, it would be difficult to find two alternate <br />septic sites. <br />Hurr asked about the 10’ and 15’ easements. The first 200’ would be adjacent to the road, <br />according to Cook, due to the wetlands on the propert>’ The 15' w’ould be r^JJ^^ed to <br />stay out of the tree line. It was noted that the easements were already granted for the <br />traU. The trail wiU be built this month. The value of the acreage would be deducted <br />against the 8% park dedication. <br />Hurr moved, Kelley seconded, to approve Resolutif n r?3601. Ayes j. Nays 0. <br />(#10) #2057 JAMES NYSTR* l I, 1745 CONCORDIA STREET - VARIANCES - <br />resolution #5602 <br />The applicant was represented by architect, Greg Frazee. <br />Gaffron noted that the aopUcation is for a number of variances. The original proposal <br />was for an addition located 23’ from the lake. The Planrdng Commission was not m favur <br />of the addition. An amended proposal was presented for a new house located at the 75 <br />setback line with a 10’ deck encroaching the 0-75' zone. The proposed new garage was <br />oroposed at a central location, which would meet setback requirements. Hardcover was <br />proposed at 10.1% in the 0-75’ zone. 31% in the 75-250’ zone, and at 60«/o in the 250- <br />500’ zone. The Planning Commission saw no justification in encroaching the 0-75 zone <br />with a deck and asked for the house and deck to be moved back out of the zone. The <br />side setback was to change fi-om 10’ to 9.6 ’. It was noted by the appUcant’s architect that <br />anv change in the house width would adversely affect the room sizes. <br />Gafifi'on reported the present proposal shows the house out of the 0-75' zone with <br />hardcover at 35% in the 75-250’ zone and at 60% in the 250-500' zone. A new <br />reconfiguration of the driveway eliminates a large portion of blacktop. Hurr said she saw <br />no hardship for a side setback variance.