My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1996 Council Packet
Orono
>
City Council
>
1996
>
10-28-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 1:30:43 PM
Creation date
9/5/2023 1:26:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. CONSTRUCTION <br />A. Plans and specifications. Lessee has. at Lessee’s sole expense, prepared, or <br />caused to be prepared, plans and specifications for a new ice arena and parking lot <br />through the Design Development Phase, and has delivered such Design Development <br />documents to Lessor. All additional plans and specifications shall be submitted to Lessor <br />for Lessor’s written approval or any revisions required by Lessor. Lessor shall not <br />unreasonably withhold such approval. Lessor acknow'ledges that it has approved the floor <br />plan, site plan and general appearance of the structure. <br />B. Construction. On or before July 1, 1997, Lessee shall, at Lessee’s sole <br />expense, commence, and shall thereafter diligently prosecute to completion the <br />construction of the arena and parking lot in accordance with such plans and <br />specifications. All such construction will be in accordance with applicable legal <br />requirements, ordinances, zoning requirements, and will be in accordance with the plans <br />and specifications for the project approved by Lessor. Prior to the commencement of any <br />w'ork. Lessee shall require the contractor or contractors performing the construction work <br />to post a performance bond or bonds and payment bond or bonds guaranteeing both the <br />completion of the construction project in accordance with project plans and specifications <br />and the payment of all subcontractors and materials suppliers and laborers in connection <br />with the work.
The URL can be used to link to this page
Your browser does not support the video tag.