Laserfiche WebLink
'‘t <br />Gray Freshwater Center <br />Hwys. IS & 19. Navarre <br />Mail: <br />2500 Shadywood Road <br />Excelsior, MN 55331-9578 <br />Phone: (612) 471-0590 <br />Fax:(612)471-0682 <br />Email: <br />adminOmnwatershed org <br />Web Site: <br />www.mnwatershed.org <br />Board ol Managers; <br />John E. Thomas <br />President <br />Pamela G. Blixt <br />Vice President <br />Monica Gross <br />Secretary <br />Thomas W. LaBounty <br />Treasurer <br />C. Woodrow Love <br />Thomas Maple. Jr. <br />Malcolm Reid <br />District Office: <br />Eugene R. Strommen <br />District Director <br />Suzanne M. Weedman <br />Asst. District Director <br />Pnniid on rtcydtd pBptr conuwung <br />iBBSt 30% pest consumtr eoMiB <br />Miooehaha dreek Watershed District <br />Improving Quality of Water, Quality of Lif> <br />August 23,1996 <br />Permit Application No. <br />Applicant: Orono Hockey Boosters, Inc. <br />P.O. Box 205 <br />Long Lake, MN 55356 <br />Location: City of Orono, PID No. 28-118-23-34-2 <br />Purpose:Construction of Orono Ice Arena with minor wetland alteration and <br />associated on site mitigation and construction of a stormwater pond, <br />Dear Orono Hockey Boosters, Inc.: <br />At the regularly scheduled August 22, 1996 meeting of the Board of Managers, the subject <br />permit application was reviewed along with tlie following exhibits: <br />1. Permit application 96-80 received April 1, 1996. <br />2. Initial wetland delineation report for investigation performed in early December 1995 <br />by GME Consultants received April 18, 1996. <br />3. Full size plans for project received April 18, 1996. <br />4. Hydrologic calculations received April 18, 1996. <br />5. Technical description of the project received April 18, 1996. <br />6. Full size and reduced size grading plan showing revised pond grading received May 1 <br />1996. <br />7. Full size grading plan including proposed wetland mitigation received July 26, 1996. <br />8. Reduced size grading plan including proposed wetland mitigation received July 31, <br />1996. <br />Due to the size and complexity of certain projects, the Board, by Rule J, requires that site <br />inspections be conducted. In these cases, the applicant is required to pay to the District a <br />fee equal to the actual costs of analysis of the project, field inspection, engineering <br />services, legal services, and any subsequent monitoring of the work. These costs are <br />referred to as Rule J fees. <br />Action was taken approving your permit application pending receipt of Rule J fees in the <br />amount of $376.05, and a signed stormwater facilities maintenance agreement. <br />With the special condition to be on the permit: <br />H «iis«i lU^wounjomuMlti 4am \r