Permit Applicatioii No. 96*80 August 16,1996 <br />Applicant: <br />Location: <br />Purpose: <br />Applicable Rules: <br />Exhibits Rev.ewed: <br />Orono Hockey Boosters, Inc. <br />P.O. Box 205 <br />Long Lake, MN 55356 <br />City of Orono, PID No. 28-118-23-34-2 <br />Construction of Orono Ice Arena with minor wetland alteration and <br />associated on site mitigation and construction of a stormwater pond, <br />Rule B - Stormwater Management and Erosion Control Plans <br />Rule D - Wetland Protection <br />1. Permit application 96-80 received April 1. 1996. <br />2. Initial wetland delineation report for investigation performed in early December 1995 by <br />GME Consultants received April 18, 1996. <br />3. Full size plans for project received April 18,1996. <br />4. Hydrologic calculations received April 18,1996. <br />5. Technical description of the project received April 18,1996. <br />6. Full size and reduced size grading plan showing revised pond grading received May 1, 1996. <br />7. Full size grading plan including proposed wetland mitigation received July 26, 1996. <br />8. Reduced size grading plan including proposed wetland mitigation received July 31, 1996. <br />Staff Review and Summary: <br />The project involves the construction of a community ice arena on approximately 4.8 acres at the <br />intersection of Old Cr> stal Bay Road tmd 6th Avenue North. The site is within the Subwatershed <br />Planning Unit U-2, LLC-13. A 7,600 square foot wetland is on site and has been delineated and <br />a sequencing analysis performed. 3,200 square feet of the wetland will be filled for construction <br />of the access road and parking lot. 2,000 square feet falls under the Wetlands Conservation Act <br />deminimus exemption. 2,884 square feet of wetland mitigation will be performed on site. The <br />required buffer zone will be provided around the remaining and the mitigated wetland. The <br />proposed stormwater management pond will control runoff rates and is designed to meet the <br />NURP standards. <br />Recommendations: <br />Approval pending receipt and staff approval of the following: <br />1. A signed stormwater facilities maintenance agreement. <br />The following condition shall be placed on the permit: <br />1. The proposed stormwater pond shall be built and functional prior to other construction to <br />assure compliance with District Rule B. <br />2. Activities including but not limited to mowing, yard waste disposal and fertilizer application <br />shall not occur within the wetland buffer zone. <br />Project Review Status by Other Governmental Units; <br />The project received preliminary approval from the City of Orono planning commission in April <br />1996.