My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1996 Council Packet
Orono
>
City Council
>
1996
>
09-23-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 12:58:10 PM
Creation date
9/5/2023 12:54:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON JULY 15, 1996(#3 - #2135 Paul and Sue Hedlund/Edna Albee Estate - Continued)Smith asked u hat w ould happen if sewering was put on hold, a new septic system was <br />built using the alternate site, and it failed Gaffron said the property owners would then <br />have to resort to pumping Peterson noted that there were many homes in Orono that <br />pumped. <br />Berg said the application was then based on what might be or what could be done <br />Martineau informed Berg that their goal was to modify the previous plan in order to <br />present a variation to the Hedlund's and bring closure to the purchase if possible. The <br />Hedlund's w ere sent the current package being review ed Smith said if that failed, then a <br />tangible plan would be possible for another buyer Martineau concurred noting it was a <br />good use of the property. <br />Schroeder asked what size holding tank w as used and whether it could hold up to a 3 <br />bedroom home. Martineau said they were under the assumption that the e.xisting tank <br />could be sealed and w ould work with Orono to determine if that was so It was noted that <br />the actual size of the tank w as immaterial as whatever pumping schedule was required <br />would have to be done Martineau said the pumping contractor would monitor the use of <br />water to gain historic data and pump accordingly. It was determinevi ‘hat the holding tank <br />was not relevant to the number of bedrooms in the house. <br />Lindquist noted that the review was similar to that of a sketch plan review. Peterson said <br />it verbally was a sketch plan review but in actuality an application Martineau responded <br />he felt there was a high probability that the Hedlunds would move forward on the <br />purchase. <br />Smith asked GaiTron if there w ere any concerns with the bluff. Gaffron saiv. grading <br />plan would be required to protect the site during const a:''*-'''' The driveway revisions <br />could possibly require retaining walls Other similar sites e noted in the area. It was <br />determined that a grading plan would be required prior, the application going before the <br />Council. <br />Lindquist noted that the hardcover w'as decreasing in the 0-75' setback and totals were <br />similar to what now e.xists. The setbacks were also similar. He saw the plan as being <br />viable. <br />3
The URL can be used to link to this page
Your browser does not support the video tag.