Laserfiche WebLink
r <br />A <br />.A <br />Request to City Council: <br />We are asking to be issued a building permit to proceed w ith the repair of our <br />deck without obtaining a site survey of 1020 N. Brown Road. <br />Reasons request should be granted <br />1. We are REPAIRING an existing deck - not adding a new structure. Wc <br />otiginally planned to replace a tew rotted boards but had to replace the <br />existing joists due to more extensive rot. The removal of the joists triggered <br />the need for the building permit and we were told by the city engineer that he <br />docs not have the authority to issue any building permit without a site survey. <br />2. The deck does not extend beyond the footprint of the house. The deck is <br />being built in an L-shaped comer of the house between the screen porch and <br />the garage. The house, screen porch and deck were all present when we <br />bought the property. The title company required the property be surveyed at <br />that time to ensure that all structures were within the property lines including <br />easements. It was determined at that time that the structures arc well within <br />the boundaries. <br />3. The replacement deck is the same design as the previous deck. It is in <br />fact slightly smaller than the original which further ensures that there is no <br />possible w ay that the deck will extend beyond the footprint of the house. <br />4. The site survey is an unnecessary expense for this project and will add <br />hundreds of dollars of additional expense without adding any value to the <br />homeowTier or the community. This project started as a simple repair job <br />and is already several thousand dollars more expensive than we had planned <br />to spend. We will be bound by the building inspections which will ensure <br />that we do not deviate from the original plan. <br />5. The requu'cment of a site survey will also delay our repair for weeks, <br />which will reduce the time we have to enjoy our repaired deck over the <br />summer and may cause us to leave the repair until next year. It would be <br />J