Laserfiche WebLink
I <br />'9REQUEST FOR COUNCIL ACTION <br />DATE: April 19^^ <br />\ <br />ITEM NO: <br />Department Appro?al: <br />Name John R. Gerhardson <br />Tide Public Works Director <br />Administrator Reviewed:Agenda Section: <br />Engineer Report <br />lira Descnption: <br />Kelly Avenue Sewer <br />In 1995 after careful smdy of the storm water problem on Kelly Avenue staff recommended to <br />Council to proceed with a storm water project that would have involved the installation of a lift <br />station that would pump the storm water by force main to the Lydiard Avenue access/swimming <br />beach. The project also included the replacement of a segment of the sanitary sewer line in <br />Kelly Avenue. <br />The City Council decided to not install the lift station but to raise the road approximately two <br />feet in the low area as well as replace the sanitary sewer line in Kelly Avenue. <br />After reviewing the televised tape of the sanitary sewer system it was determined to relocate a <br />manhole on Kelly Avenue 50 feet to the south, replace the sanitary sewer line on Kelly Avenue <br />and relocate a sanitary sewer line that runs east of Kelly Avenue through residential yards. <br />This matter was presented to Council in November of 1995 and approved to acquire the <br />easements necessary to construct the sewer line. <br />The amount estimated for replacing the sewer line in Kelly Avenue only was $18,090, by <br />replacing the sewer line east of Kelly Avenue the engineer’s estimate was increased to $45,000. <br />Bid and specs were prepared and we advertised for bids with the low bid at $40,595.50. <br />Funding ir n a <br />The total cost of $40,000 is divided between replacing the sewer line under Kelly Avenue <br />($!8.000) and replacing the sewer line that is perpendicular to Kelly Avenue to move it out of <br />the wetland area ($22,000). The $18,000 cost can be accommodated within the Sewer Operating <br />Budget under the sewer line repair account. The replacement of the line perpendicular to Kelly <br />Avenue requires a budget amendment to add $22,000 to the amount budgeted for Capital Outlay <br />in the Sewer Fund for 1996. The Sewer Fund has sufficient reserves to accommodate this <br />expenditure and these reserves have been set aside specifically tor this purpose. <br />COUNCIL ACTION REQUESTED <br />Motion to award the bid for the Kelly Avenue area sewer project to Widmer Inc. at a cost of <br />$40 595 50 to be funded from the Sewer Fund Operating Budget ($18,000) and from the Sewer <br />Fund Capital Outlay Budget ($22,595.50), and amending the Sewer Fund Capital Outlay Budget <br />to include the additional $22,595.50 expenditure.