My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-1997 Planning Packet
Orono
>
Planning Commission
>
1997
>
05-19-1997 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 4:23:40 PM
Creation date
8/31/2023 4:16:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cmroFORONo <br />INSPECTION NOTICE |yj <br />DATE TIME <br />PERMIT NO._______ <br />ADDRESS yQ^C> <br />CALLED IN <br />SCHEDULED <br />completed <br />T^^^VACuJA• <br />OWNER F/UflO -------------------- <br />TELEPHONE NO.__________ <br />CONTR. <br />i. <br />JiJ <br />i <br />DESCRIPTION o.c <br />1 8 <br />§ <br />2 <br />01 FOOTmO <br />02 FRAMING <br />03 INSULATION <br />oAWAaeo. <br />05 FINAL <br />07 DEMO-SITE <br />07 DEMO-FINAL <br />09PLUMBINQRI <br />10 PLUMBING FINAL <br />OWNER/CONTRACTOR TO MEET YOU: <br />COMMENTS:______ <br />ti mechanical Rl <br />13 mechanical FUAL <br />24/25 WOOD BURNER/FIREPLACE <br />12 WATER HOOK4JP <br />14 SEWER HOOK-UO <br />27 SEPTIC MAINT. <br />15 SEPTIC INSTAU. <br />23 SEPTIC FINAL <br />18 EXCAV/QRAOINQ/FILUNa <br />18 lATESHORE/WETlANOS <br />34 TREE REMOVAL <br />17 SITE INSPECTION <br />06 PROGRESS <br />21 COMPLAINT <br />22FOLLOW4IP <br />35 HARO COVER REMOVAL <br />36 FOUNDATION REMOVAL <br />Ct^O\)P^ or <br />0: <br />0 u. <br />U j <br />1 <br />CL(A^ I5p.VlAa<■ ^ V)~ <br />fn lor \}g<ricuA/:pHL <br />t to <br />::o <br />o <br />Uj <br />cc <br />U j <br />Q <br />O <br />D <br />fc WORK SATISFACTORY; PROCEED <br />C CORRECT WORK & PROCEED <br />D CORRECT WORK, CALL FOR REINSPECTION <br />BEFORE COVERING <br />O CORRECT UNSAFE CONDITION WITHIN <br />INSPECTOR WILL RETURN <br />HOURS. <br />“ PROJECT COMPLETE <br />C ISSUE CERTIFICATE OF OCCUPANCY <br />________temporary <br />________PERMANENT <br />O STOr ORDER POSTED. CALL INSPECTOR <br />a INSPECTION REOUIRED. CALL TO ARRANGE ACCESS. <br />C PHOTO TAKEN <br />□ QTATION ISSUED <br />Call for the next Inspection 24 hours in advance.473 “735Z <br />Owner/Contractor on sltcrTT v \__________• <br />Inspector <br />Whitt Copy/lnsptclof^ Flit Ctfiary Copy/SHt NoUct
The URL can be used to link to this page
Your browser does not support the video tag.