Laserfiche WebLink
3-13-1 S96 5.IOPM FPa-l Ba^ESTPCXD * ASSOC 612 636 1311 P. 2 <br />Ms. Jeanne A. Mabusth <br />City of Orono <br />Pagf -2- <br />March 13, 1906 <br />across the proposed ponding area and storm sewer in Navarre Lane. A 7-foot <br />casement for trail purposes should be provided along Shoreline Drive. All easements <br />must be provided by separate document as this will not bo platted. <br />6. Parking LoU The parking lot should be paved with concrete curb and gutter. The <br />driving lanes within the parking lot should have a 9-ton pavement section for trucks. <br />A geotechnical eval^ition of the soils should be done in conjunction with the pavement <br />design. <br />8. Financial Guarante * I he applicant’s engineer should provide an estimate of the total <br />cost for the site iinpi- .'iiieiits for our review. We will determine the amount of the <br />financial guarantee uqi.ircd. <br />riea.se contact me at this ^ .c if you h.ive any questions regarding this matter. <br />Yours ver\' tndv, <br />BONESTROO. KOSENE. ANDEKLIK & ASSOCLVTES, INC. <br />M 2b <br />Shawn D. Gustafson. P.E.