My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-1996 Council Packet
Orono
>
City Council
>
1996
>
03-25-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 4:15:25 PM
Creation date
8/31/2023 4:10:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To: <br />From: <br />Date: <br />Subject: <br />Chair Peterson and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />March 14, 1996 <br />#2107 John O'Sullivan/Erwin Smith, 3340 Shoreline Drive - <br />Vacation/Conditianal Use Permits Commercial Site Plan Review A'ariances - <br />Request by Applicant for further Consideration of the Planning Commission <br />Review of Action of Planning Commission <br />At Februaiy' 20. 1996 meeting, four members of the Planning Commission were unable to <br />effect a legal vote. Two members moved to approve the application as proposed subject to the <br />satisfaction of the City staff that all internal traffic issues were resolved before presenting <br />application to the Council. Tlie two members who denied the motion conceded that the three <br />variances sought by applicant were acceptable as long as the many safety issues and obvious <br />failings of the internal traffic plan were solved. If internal traffic problems could not be <br />addressed effectively, then they would have to recommend denial of the application. <br />Mr. O’Sullivan has submitted a letter requesting rescheduling before the Planning Commission <br />to reconlimi for the entire Planning Commission that internal traffic issues have been resolved <br />to both the County and City staffs satisfaction. <br />List of E.xhibits <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />Applicant’s Request for Rescheduling Before the Planning Commission <br />Hennepin DOT, Zetterstrom Report, 3/6/96 <br />Boneslroo, Sheldon J. Johnson, Transportation Group Leader, 3/8/96 <br />Bonestroo, Shawn Gustafson Report. 3/13/96 <br />Signage Request <br />Signage Location Map <br />Amended Site Plan <br />Engineering/Detail Site Plan <br />Amended Vacation Plan <br />Brief Review of .Application #2107 <br />Tlie application consisted of the partial vacation of Navarre Lane, approval ol a conditional use <br />permit for a Class 1 restaurant, approval of a conditional use permit Icr motor tuel station, <br />commercial site plan approval and three variances to required standards for commercial <br />development within the B-1 zoning district. The first variance consisted of a structural setback <br />for the car wash proposed at 5' where a 35' setback is required. The second was for a <br />structural coverage variance as property is less than 1.99 acres in area. The applicant seeks
The URL can be used to link to this page
Your browser does not support the video tag.