My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-1996 Council Packet
Orono
>
City Council
>
1996
>
01-08-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2023 2:57:48 PM
Creation date
8/31/2023 2:55:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-/ <br />if <br />CITY OF ORONO <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />473-7357 <br />APPLICATION NO. #1958 <br />NOTICE OF COUNCIL ACTION <br />Date of Notice: December 12, 1995 <br />TO: Louis Oberhauser <br />121 Chevy Chase Drive <br />Wayzata. MN 55391 <br />COPIES: Copy of Notice faxed to <br />L. Oberhauser office on 12/13/95 <br />(473-7863) <br />TYPE OF APPLICATION: Preliminaty^ Subdivision of Replat <br />DATEOFMEEIING: 12/11/95 DATE: 4 FOR 0 AGAINST <br />COUNCIL ACTION - MOTION: <br />Council voted to conceptually approve a replat of the three substandard parcels into two lots. <br />Conceptual approval included granting of lot area variances, lot width variances, street setback <br />variance for new construction on Lot 1. structural coverage variance for Lot 1 and hardcover <br />variances within the 75-250' setback area for both Lots 1 and 2. In order to meet the filing deadline <br />for schedulinu at the January ’ 8th Council meeting, applicant shall provide by Friday, December 29th <br />an amended development plan for Lots 1 and 2 that shall address the following guidelines and <br />variances conceptually approved by the Council: <br />1. Lot lines to be realigned so ihat a shared access is provided at Shoreline Drive. <br />Applicant and applicant's sur\eyor should consult with Hennepin County DOT <br />representative. Dave Zetterstrolim (930-2500), for the purpose of locating an <br />approved access at Shoreline Drive. <br />2. Garage addition for house proposed on Lot 1 may be located 5' from County Road <br />15 right-of-way. <br />.Applicant's sur\eyor to provide amended hardcover facts for revised development <br />plan. The City recognizes hardcover variance for Lot 1 will be more intense with the <br />loss of the additional area. Council conceptually approved a structural coverage <br />variance for Lot 1. also recognizing the loss of the additional area and the desire of <br />the City to pull the new structure out of the 0-75' setback area. Applicant is <br />cautioned to reduce the footprint area of the structure on Lot 1 in order to minimize <br />the intensity of the structural coverage variance. It is not the practice of the City to <br />approve structural coverage variances when dealing with new development ot a <br />property. <br />.Ml existing and proposed improvements are to be located out of the 0-75’ setback <br />area. Revised survey should show the removal of landscape timbers within proposed <br />Lot 2. Staff realizes the difficulty of locating the sewer line within this limited <br />period of time. The plan to be presented for Council ’s review at their January 8th
The URL can be used to link to this page
Your browser does not support the video tag.