My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227600v1 <br />14 <br /> <br /> <br />the Architect’s notice, the Owner determines that all or parts of the se rvices are not required, the Owner shall give <br />prompt written notice to the Architect of the Owner’s determination. The Owner shall compensate the Architect for <br />the services provided prior to the Architect’s receipt of the Owner’s notice. <br />.1 Reviewing a Contractor’s submittal out of sequence from the submittal schedule approved by the <br />Architect; <br />.2 Responding to the Contractor’s requests for information that are not prepared in accordance with the <br />Contract Documents or where such information is available to the Contractor from a careful study <br />and comparison of the Contract Documents, field conditions, other Owner -provided information, <br />Contractor-prepared coordination drawings, or prior Project correspondence or documentation; <br />.3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor’s <br />proposals and supporting data, or the preparation or revision of Instruments of Service; <br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker; or, <br />.5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br />Instruments of Service resulting therefrom. <br /> <br />§ 4.2.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br />Services. When the limits below are reached, the Architect shall notify the Owner: <br />.1 « two » ( « 2 » ) reviews of each Shop Drawing, Product Data item, sample and similar submittals of <br />the Contractor <br />.2 «Up to » ( « 45 » ) visits to the site by the Architect during construction <br />.3 «Up to » ( « 4 » ) inspections for any portion of the Work to determine whether such portion of the <br />Work is substantially complete in accordance with the requirements of the Contract Documents <br />.4 « Two » ( « 2 » ) inspections for any portion of the Work to determine final completion. <br /> <br />§ 4.2.4 Except for services required under Section 3.6.6.5 and those services that do not exceed the limits set forth in <br />Section 4.2.3, Construction Phase Services provided more than 60 days after (1) the date of Substantial Completion <br />of the Work or (2) the initial date of Substantial Completion identified in the agreement between the Owner and <br />Contractor, whichever is earlier, shall be compensated as Additional Services to the extent the Architect incurs <br />additional cost in providing those Construction Phase Services. <br /> <br />§ 4.2.5 If the services covered by this Agreement have not been completed within « » ( « » ) months of the date of <br />this Agreement, through no fault of the Architect, extension of the Archi tect’s services beyond that time shall be <br />compensated as Additional Services. <br /> <br />ARTICLE 5 OWNER’S RESPONSIBILITIES <br />§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner <br />regarding requirements for and limitations on the Project, including a written program, which shall set forth the <br />Owner’s objectives; schedule; constraints and criteria, including space requirements and relationships; flexibility; <br />expandability; special equipment; systems; and site requirements. <br /> <br />§ 5.2 The Owner shall establish the Owner’s budget for the Project, including (1) the budget for the Cost of the <br />Work as defined in Section 6.1; (2) the Owner’s other costs; and, (3) reasonable contingencies related to all of these <br />costs. The Owner shall update the Owner’s budget for the Project as necessary throughout the duration of the Project <br />until final completion. If the Owner significantly increases or decreases the Owner’s budget for the Cost of the <br />Work, the Owner shall notify the Architect. The Owner and the Architect shall thereafter agree to a corresponding <br />change in the Project’s scope and quality. <br /> <br />§ 5.3 The Owner shall identify a representative authorized to act on the Owner’s behalf with respect to the Project. <br />The Owner shall render decisions and approve the Architect’s submittals in a timely manner in order to avoid <br />unreasonable delay in the orderly and sequential progress of the Architect’s services. <br /> <br />§ 5.4 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations for <br />the site of the Project, and a written legal description of the site. The su rveys and legal information shall include, as <br />applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands; <br />adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and <br />contours of the site; locations, dimensions, and other necessary data with respect to existing buildings, other <br />improvements and trees; and information concerning available utility services and lines, both public and private,
The URL can be used to link to this page
Your browser does not support the video tag.