My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227600v1 <br />13 <br /> <br /> <br />§ 4.1.2 Description of Supplemental Services <br />§ 4.1.2.1 A description of each Supplemental Service identified in Section 4.1.1 as the Architect’s responsibility is <br />provided below. <br />(Describe in detail the Architect’s Supplemental Services identified in Section 4.1.1 or, if set forth in an exhibit, <br />identify the exhibit. The AIA publishes a number of Standard Form of Architect’s Services do cuments that can be <br />included as an exhibit to describe the Architect’s Supplemental Services.) <br /> <br />« » <br /> <br />§ 4.1.2.2 A description of each Supplemental Service identified in Section 4.1.1 as the Owner’s responsibility is <br />provided below. <br />(Describe in detail the Owner’s Supplemental Services identified in Section 4.1.1 or, if set forth in an exhibit, <br />identify the exhibit.) <br /> <br />« » <br /> <br />§ 4.1.3 If the Owner identified a Sustainable Objective in Article 1, the Architect shall provide, as a Supplemental <br />Service, the Sustainability Services required in AIA Document E204™–2017, Sustainable Projects Exhibit, attached <br />to this Agreement. The Owner shall compensate the Architect as provided in Section 11.2. <br /> <br />§ 4.2 Architect’s Additional Services <br />The Architect may provide Additional Services after execution of this Agreement without invalidating the <br />Agreement. Except for services required due to the fault of the Architect, any Additional Services provided in <br />accordance with this Section 4.2 shall entitle the Architect to compensati on pursuant to Section 11.3 and an <br />appropriate adjustment in the Architect’s schedule. <br /> <br />§ 4.2.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the <br />Owner with reasonable promptness, but in any event no later than thirty (30) days from the event necessitating <br />Additional Services,and explain the facts and circumstances giving rise to the need. The Architect shall not proceed <br />to provide the following Additional Services until the Architect receives the Owner’s written authorization: <br />.1 Services necessitated by a change in the Initial Information, previous instructions or approvals given <br />by the Owner, or a material change in the Project including size, quality, complexity, the Owner’s <br />schedule or budget for Cost of the Work, or procurement or delivery method; <br />.2 Services necessitated by the enactment or revision of codes, laws, or regulations, including changing <br />or editing previously prepared Instruments of Service; <br />.3 Changing or editing previously prepared Instruments of Service necessitated by official <br />interpretations of applicable codes, laws or regulations that are either (a) contrary to specific <br />interpretations by the applicable authorities having jurisdiction made prior to the issuance of the <br />building permit, or (b) contrary to requirements of the Instruments of Service when those Instruments <br />of Service were prepared in accordance with the applicable standard of care; <br />.4 Services necessitated by decisions of the Owner not rendered in a timely manner or any o ther failure <br />of performance on the part of the Owner or the Owner’s consultants or contractors; <br />.5 Preparing digital models or other design documentation for transmission to the Owner’s consultants <br />and contractors, or to other Owner-authorized recipients; <br />.6 Preparation of design and documentation for alternate bid or proposal requests proposed by the <br />Owner; <br />.7 Preparation for, and attendance at, a public presentation, meeting or hearing; <br />.8 Preparation for, and attendance at, a dispute resolution proceeding or legal proceeding, except where <br />the Architect is party thereto; <br />.9 Evaluation of the qualifications of entities providing bids or proposals; <br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction ; <br />or, <br />.11 Assistance to the Initial Decision Maker, if other than the Architect. <br /> <br />§ 4.2.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, <br />notify the Owner with reasonable promptness, but in any event no later than thirty (30) days from the event <br />necessitating Additional Services, and explain the facts and circumstances giving rise to the need. If, upon receipt of
The URL can be used to link to this page
Your browser does not support the video tag.