My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227600v1 <br />11 <br /> <br /> <br />submitted to the Architect. The Architect’s review shall be for the limited purpose of checking for conformance with <br />information given and the design concept expressed in the Contract Documents. The Architect shall be entitled to <br />rely upon, and shall not be responsible for, the adequacy and accuracy of the services, certifications, and approvals <br />performed or provided by such design professionals. <br /> <br />§ 3.6.4.4 Subject to Section 4.2, the Architect shall review and respond to requests for information about the <br />Contract Documents. The Architect shall set forth, in the Contract Documents, the requirements for requests for <br />information. Requests for information shall include, at a minimum, a detailed written statement that indicates the <br />specific Drawings or Specifications in need of clarification and the nature of the clarification requested. The <br />Architect’s response to such requests shall be made in writing within any time limits agreed upon, or otherwise with <br />reasonable promptness. If appropriate, the Architect shall prepare and issue supplemental Drawings and <br />Specifications in response to the requests for information. <br /> <br />§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br />accordance with the requirements of the Contract Documents. <br /> <br />§ 3.6.5 Changes in the Work <br />§ 3.6.5.1 The Architect may order minor changes in the Work that are consistent with the intent of the Contract <br />Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to <br />Section 4.2, the Architect shall prepare Change Orders and Construction Change Directives for the Owner’s <br />approval and execution in accordance with the Contract Documents. <br /> <br />§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br /> <br />§ 3.6.6 Project Completion <br />§ 3.6.6.1 The Architect shall: <br />.1 conduct inspections to determine the date or dates of Substantial Completion an d the date of final <br />completion; <br />.2 issue Certificates of Substantial Completion; <br />.3 forward to the Owner, for the Owner’s review and records, written warranties and related documents <br />required by the Contract Documents and received from the Contractor; and, <br />.4 issue a final Certificate for Payment based upon a final inspection indicating that, to the best of the <br />Architect’s knowledge, information, and belief, the Work complies with the requirements of the <br />Contract Documents. <br /> <br />§ 3.6.6.2 The Architect’s inspections shall be conducted with the Owner to check conformance of the Work with the <br />requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br />Contractor of Work to be completed or corrected. <br /> <br />§ 3.6.6.3 When Substantial Completion has been achieved, the Architect shall inform the Owner about the balance <br />of the Contract Sum remaining to be paid the Contractor, including the amount to be retained from the Contract <br />Sum, if any, for final completion or correction of the Work. <br /> <br />§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1) <br />consent of surety or sureties, if any, to reduction in or partial release of retainage or t he making of final payment; (2) <br />affidavits, receipts, releases and waivers of liens, or bonds indemnifying the Owner against liens; and (3) any other <br />documentation required of the Contractor under the Contract Documents. <br /> <br />§ 3.6.6.5 Upon request of the Owner, and prior to the expiration of one year from the date of Substantial <br />Completion, the Architect shall, without additional compensation, conduct a meeting with the Owner to review the <br />facility operations and performance. <br /> <br />ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />§ 4.1 Supplemental Services <br />§ 4.1.1 The services listed below are not included in Basic Services but may be required for the Project. The <br />Architect shall provide the listed Supplemental Services only if specifically designated in the table below as the <br />Architect’s responsibility, and the Owner shall compensate the Architect as provided in Section 11.2. Unless