Laserfiche WebLink
227600v1 <br />3 <br /> <br /> <br /> <br />« Preliminary Design – September 2023 » <br /> <br />.2 Construction commencement date: <br /> <br />« » <br /> <br />.3 Substantial Completion date or dates: <br /> <br />« » <br /> <br />.4 Other milestone dates: <br /> <br />« » <br /> <br />§ 1.1.5 The Owner intends the following procurement and delivery method for the Project: <br />(Identify method such as competitive bid or negotiated contract, as well as any requirements for accelerated or fast- <br />track design and construction, multiple bid packages, or phased construction.) <br /> <br />« »Design-Bid-Build <br /> <br />§ 1.1.6 The Owner’s anticipated Sustainable Objective for the Project: <br />(Identify and describe the Owner’s Sustainable Objective for the Project, if any.) <br /> <br />« »Sustainable opportunities and strategies compliant with City of Orono standards. <br /> <br /> <br />§ 1.1.6.1 If the Owner identifies a Sustainable Objective, the Owner and Architect shall complete and incorporate <br />AIA Document E204™–2017, Sustainable Projects Exhibit, into this Agreement to define the terms, conditions and <br />services related to the Owner’s Sustainable Objective. If E204–2017 is incorporated into this agreement, the Owner <br />and Architect shall incorporate the completed E204 –2017 into the agreements with the consultants and contractors <br />performing services or Work in any way associated with the Sustainabl e Objective. <br /> <br />§ 1.1.7 The Owner identifies the following representative in accordance with Section 5.3: <br />(List name, address, and other contact information.) <br /> <br />« » <br />« » <br />« » <br />« » <br />« » <br />« » <br /> <br />§ 1.1.8 The persons or entities, in addition to the Owner’s representative, who are required to review the Architect’s <br />submittals to the Owner are as follows: <br />(List name, address, and other contact information.) <br /> <br />« »Adam Edwards, P.E., City Administrator / City Engineer <br />2750 Kelley Parkway, Orono, MN 55356 <br />952-249-4610 | aedwards@ci.orono.mn.us <br /> <br />§ 1.1.9 The Owner shall retain the following consultants and contractors: <br />(List name, legal status, address, and other contact information.) <br /> <br />.1 Geotechnical Engineer: <br /> <br />« »«AET »