My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2023 Council Packet
Orono
>
City Council
>
2023
>
08-28-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 1:54:40 PM
Creation date
8/30/2023 1:51:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227600v1 <br />2 <br /> <br /> <br />TABLE OF ARTICLES <br /> <br />1 INITIAL INFORMATION <br /> <br />2 ARCHITECT’S RESPONSIBILITIES <br /> <br />3 SCOPE OF ARCHITECT’S BASIC SERVICES <br /> <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> <br />5 OWNER’S RESPONSIBILITIES <br /> <br />6 COST OF THE WORK <br /> <br />7 COPYRIGHTS AND LICENSES <br /> <br />8 CLAIMS AND DISPUTES <br /> <br />9 TERMINATION OR SUSPENSION <br /> <br />10 MISCELLANEOUS PROVISIONS <br /> <br />11 COMPENSATION <br /> <br />12 SPECIAL TERMS AND CONDITIONS <br /> <br />13 SCOPE OF THE AGREEMENT <br /> <br /> <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(For each item in this section, insert the information or a statement such as “not applicable” o r “unknown at time <br />of execution.”) <br /> <br />§ 1.1.1 The Owner’s program for the Project: <br /> (Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in <br />which the program will be developed.) <br /> <br />« » The initial program was developed as part of a general review of the project extents in a previous study phase. <br />The final program will be determined in the conceptual planning phase <br /> <br />§ 1.1.2 The Project’s physical characteristics: <br />(Identify or describe pertinent information about the Project’s physical characteristics, such as size; location; <br />dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of <br />public and private utilities and services; legal description of the site, etc.) <br /> <br />« » The existing building is combination of masonry, metal panels, and a pre-engineered building frame. The <br />building is located within the existing City Municipal campus. <br /> <br />§ 1.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br /> <br />« »$3.3 million dollars <br /> <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br /> <br />.1 Design phase milestone dates, if any:
The URL can be used to link to this page
Your browser does not support the video tag.