Laserfiche WebLink
227600v1 <br />2 <br /> <br /> <br />TABLE OF ARTICLES <br /> <br />1 INITIAL INFORMATION <br /> <br />2 ARCHITECT’S RESPONSIBILITIES <br /> <br />3 SCOPE OF ARCHITECT’S BASIC SERVICES <br /> <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> <br />5 OWNER’S RESPONSIBILITIES <br /> <br />6 COST OF THE WORK <br /> <br />7 COPYRIGHTS AND LICENSES <br /> <br />8 CLAIMS AND DISPUTES <br /> <br />9 TERMINATION OR SUSPENSION <br /> <br />10 MISCELLANEOUS PROVISIONS <br /> <br />11 COMPENSATION <br /> <br />12 SPECIAL TERMS AND CONDITIONS <br /> <br />13 SCOPE OF THE AGREEMENT <br /> <br /> <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(For each item in this section, insert the information or a statement such as “not applicable” o r “unknown at time <br />of execution.”) <br /> <br />§ 1.1.1 The Owner’s program for the Project: <br /> (Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in <br />which the program will be developed.) <br /> <br />« » The initial program was developed as part of a general review of the project extents in a previous study phase. <br />The final program will be determined in the conceptual planning phase <br /> <br />§ 1.1.2 The Project’s physical characteristics: <br />(Identify or describe pertinent information about the Project’s physical characteristics, such as size; location; <br />dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of <br />public and private utilities and services; legal description of the site, etc.) <br /> <br />« » The existing building is combination of masonry, metal panels, and a pre-engineered building frame. The <br />building is located within the existing City Municipal campus. <br /> <br />§ 1.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br /> <br />« »$3.3 million dollars <br /> <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br /> <br />.1 Design phase milestone dates, if any: