Laserfiche WebLink
lime yellow diamond grade. <br />100346.1 - CAPACITIES PLACARD <br />The apparatus shall have a reflective placard that provides the following information: <br />Water Tank Capacity <br />Pump Capacities <br />NWCG Typing <br />Skeeter Contact Information <br />100605.1 - WHEEL CHOCKS <br />Two (2) Zico Aluminum Wheel Chocks for large trucks NFPA wildland compliant shall be provided on the apparatus. <br />100421.1 - SCBA BRACKETS <br />One (1) SCBA bracket shall be installed. <br />Location: To be determined at pre-construct meeting. <br />100040.1 - CHASSIS PREPARATION <br />The chassis cab shall be "prepped" for fire apparatus production as follows: <br />a) Wash and clean chassis <br />b) Weigh chassis for NFPA reports <br />c) Quality control check in. <br />100041.1 - SEATING <br />There shall be a label identifying the number of seat belted locations on the unit. <br />100043.1 - LOUD NOISE WARNING LABEL <br />A final stage manufacturer shall install "hearing loss" potential warning labels on the vehicle in any areas or fixed equipment <br />that produces excessive noise levels. (exhaust outlet, sirens and air horns shall not be required for such equipment.) <br />100135.1 - WARNING LABEL -- NO RIDING ON REAR <br />A warning label stating: "NO RIDING ON REAR OF APPARATUS" shall be installed on rear of the apparatus. The label shall be <br />applied to the vehicle at the rear step area. The label shall warn personnel that riding in or on these areas, while the vehicle <br />is in motion, is prohibited. <br />100136.1 - SKEETER BRUSH TRUCK EMBLEMS <br />Five (5) Skeeter Emergency Vehicles emblems will be affixed to the cab and body. <br />100196.1 - FINAL ASSEMBLY AND APPARATUS FINISHING PREP SPECIFICATIONS <br />The apparatus shall be assembled in a high quality and controlled environment. The fit, form, and finish of the body shall be <br />to the highest level fire apparatus manufacturing standards. Upon completion, the apparatus shall be ready for final <br />inspection and road testing as required herein. <br />100361.1 - FIRE PUMP OPERATIONS TEST <br />The fire pump shall have a operational pump test performed by a Skeeter Emergency Vehicles technician with a run time of <br />one (1) hour to confirm proper operations of all pump related components. <br />*** NOTE: ALL TESTING SHALL BE DONE AND PERFORMANCE OBSERVED BETWEEN SEA LEVEL AND 1000' ELEVATION. <br />*** HIGH ALTITUDE PERFORMANCE MAY NOT REPRESENT TESTING RESULTS SHOWN. <br />100362.1 - ELECTRICAL LOAD ANALYSIS <br />A 12 volt electrical load analysis shall be performed in order to test response and stationary modes of electrical amp load. <br />100363.1 - NFPA COMPLIANCE <br />The fire apparatus shall be built to the purchaser's requirements stated in this specification in compliance with all state and <br />Skeeter Brush Trucks Page 19 07/21/2023