My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1997 Navarre Water Plant Public Hearing Packet
Orono
>
City Council
>
1997
>
09-23-1997 Navarre Water Plant Public Hearing Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 12:18:03 PM
Creation date
8/1/2023 12:17:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. $200,000 from Water Fund Reser\ es. These reserves are available due to water rate increases <br />in recent years that have enabled the City to set aside funds for major water system <br />infrastructure rehabilitation. <br />2. $ 277,000 internal loan from the Building Outlay Fund to be repaid from water operating <br />revenues (reflected in water rates) <br />3. $263,000 from assessments on all properties in the Navarre water system service area ($350 per <br />unit X 752 units) This assessment will be payable over a maximum five year period with <br />interest. The estimated yearly payment for this assessment at 8% interest is $90. <br />In the past, water rates w'ere not providing adequate funding for the City's water operating fund. <br />Over the past several years, water rates have been increased on an annual basis to provide adequate <br />funding for system depreciation and effective operation ai.d maintenance of the water system. These <br />new water rates have improved the status of the water fund and have provided cash reserv'es that can <br />be i:*2;d to finance part of the water plant rehabilitation project. <br />Based on current trends, the City is planning on maintaining an annual water rate increase of 2.95% <br />to provide for continued adequate funding for the water system. This will result in a yearly increase <br />of ^proximately $2.50 per quarter an average quarterly bill. <br />Project Schedule <br />The proposed schedule for this project is described below <br />September 23, 1997 Public Hearing <br />October to December 1997 Complete Project Plans <br />January 1998 Open Bids and Hold Assessment Hearing <br />February 1998 Award Construction Contract and Order Equipment <br />September to December 1998 Complete Project Construction <br />A project overview will be presented and public comments solicited at this meeting. Written <br />comments may also be submitted to the City before this public hearing. A copy of the feasibility <br />study for this project is available for review in the City offices during normal business hours. <br />Sincerely; <br />Grego^^. Gappa <br />Director of Public Services <br />1
The URL can be used to link to this page
Your browser does not support the video tag.