Laserfiche WebLink
them would te approximately $11,000 per unit. The cost of the remaining FOJ«< <br />D^e^d Heritages Lane area would be approximately $18,000 per unit. The reason for the cost <br />diSLce is that Ln die project is done as a combined project, th-ost of jhe im statmn^s s . d <br />among all properties. When the Shoreline Drive area is separated out, that area can be served <br />without a lift station so the project would not include the lift station cost. <br />Althouirh a combined project would enable lower costs for the Heritage Drive/Heritage Lane area <br />difresfdents on Shoreline Drive would probably question paying for the lift station which is not <br />required to serve the Shoreline Drive Bre^ <br />^^iTntT*rtamX^R i^toion, for this area, has been contacted atout a possible <br />sewe^r project The area residents have dUcussed this situation. Seven residents favor a project <br />wrsevefr^sidL opposed to a project. This area has four homes with newer conforming <br />systems and five homes with non conforming systems. The remainder of the <br />systems that meet the 3-foot separation requirement, but are not totally <br />factors such as system size. In general, these systems are ftmctiomng adequately. With th <br />system conditions it is veiy difficult to predict when a substantial majority of the property owners <br />will favor a sewer project. <br />consider a fiill assessment P™J«t for^ Shorrfi« tove t«a <br />based on five of the six affected property owners requesting a project, |he timng o P J <br />is important because of the one failing system and one very marginal system^ Th P P <br />schedule would be for construction of this project in 1998, in conjunction with the Mg'«^ <br />Hills project A future prcject could be completed for the Heritage Drive/ Heriuge Lane area <br />upon rl^S by a subsuntial number of the project area resident. The “ <br />ordering^ the preparation of a feasibility study is presented for consideration by the Council <br />COUNCIL ACTION REQUESTED: <br />Consideration of the attached resolution to order preparation of a feasibility study for a saratary <br />sewer project on Shoreline Drive west of Heritage Lane. <br />110697.4