My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-1997 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1997
>
10-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:09:37 AM
Creation date
8/1/2023 10:05:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. <br />5. <br />6. <br />7. <br />8. <br />The property is served by municipal sewer and water. <br />The property abuts U.S. Highway 12 as well as Outlet D, Sugar Woods, a <br />segment of a proposed future frontage road corridor platted within Sugar Woods. <br />In 1987 the City adopted Comprehensive Plan Amendment No. 2 which planned <br />for the future development of a frontage road between Brown Road and Willow <br />Drive, paralleling Highway 12. In 1987 it was anticipated that traffic on <br />Highway 12 would continue to increase as a result of the upcoming completion <br />of Interstate Highway 394. The purpose of this planned frontage road was <br />to reduce and/or eliminate access directly to and from Highway 12, generally for <br />safety and traffic flow reasons. Comprehensive Plan Amendment No. 2 <br />specifically addressed road improvements needed prior to development of the <br />commercial corridor as follows: <br />"Prior to the development of the commercial portion of this property, the <br />existing intersection at Brown Road and Highway 12 shall be improved <br />so that safety concerns associated with the current use and future <br />increased use of this intersection are addressed. Configuration of the <br />frontage road and North Brown Road would be determined at the time <br />of development." <br />Orono’s 1994-95 reconstruction of Brown Road alleviated alignment concerns <br />with the 12/Brown intersection, and Mn/DOTs 1995-96 safety improvements on <br />Highway 12 similarly alleviated a number of safety concerns. <br />The plat of Sugar Woods, completed in July 1989, included two commercially <br />zoned parcels (Outlets E and F) abutting Highway 12. These two parcels were <br />platted as outlets, rather than as buildable lots, because the Applicant at that time <br />wished to delay decisions regarding future access to the commercial property <br />until such time that it was developed. <br />The Sugar Woods plat conformed to the comprehensive plan by creating Outlet <br />D, a short segment of the proposed future east/west frontage road. Outlet D, <br />however, only provides a corridor from the west boundary of Sugar Woods to <br />Page 2 of 9
The URL can be used to link to this page
Your browser does not support the video tag.