My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-1997 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1997
>
10-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:09:37 AM
Creation date
8/1/2023 10:05:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON SEPTEMBER 22.1997 <br />(#6 - #2281 Hennepin County Road 6 Improvements - Continued) <br />Jabbour reported that the project was originally assigned to a committee made up of Staff <br />and Council. The final desisn was worked on after that. Jabbour said he is unhaoov with <br />the fact that the County had informed those present at that Planning Commission meeting <br />that they would be visited by the real estate people. If there was a holdup with that <br />contact, they should have been notified by letter. <br />Goetten agreed that improved communication is required. <br />Jabbour noted that Jim Grube did meet with nei^bors. <br />Moorse asked Theis if there was a brochure regarding right-of-way and the process <br />taken. Thds said the brochure has been available at several meetinos. He sussested a <br />mass mailing be done. <br />Theis said bids were bdng advertised with award in December for a spring start. He felt <br />this schedule should bring about a reaction fi*om the real estate people. <br />Jabbour said the information needs to be communicated to the residents. <br />Kelley moved, Jabbour seconded, to ^prove Resolution No. 3968. Vote: Ayes 4, Nays <br />1, Goetten. <br />Jabbour directed Moorse to send a letter to the residents regarding the process. Thds <br />asked that this be coordinated between Moorse and himself Jabbour supported that <br />request. <br />Flint said he was unclear regarding the monies collected by the MCWD for wetland <br />mitigation being spent in the Citv. Gafifron said he would send a letter to BWSR <br />encouraging them to do projects within Orono. <br />(#7) #2284 JAMES SLECHTA, 3700 NORTHERN AVENUE - VARIANCE <br />The Applicant was present. <br />Van Zomeren distributed photographs of the property. The proposal is for construction <br />of a 42'x96* oversized accessory structure on a 3.97 acre parcel. A variance is required <br />as the size exceeds the maximum allowed for an individud accessory structure and the <br />maximum for all accessory structures allowed on the lot. The hdght of the structure will <br />also exceed the hdght of the 16' principal structure requiring a variance. The Planning <br />Commission unanimously recommended denial of the application.
The URL can be used to link to this page
Your browser does not support the video tag.