Laserfiche WebLink
r <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JUNE 16, 1997 <br />(pS - H2247 Wayne Holmes - Continued) <br />Lindquist moved. Smith seconded, to approve Application #2247 with the understanding <br />that the building cannot be closer than 10' to any property line or other stmcture, at a <br />maximum of 825 s.f, with retaining walls to be approved by the City Engineer, and p ans <br />submitted to staff prior to construction. <br />The appUcaW asked if a separate permit was required for the retaining walls. Gaffron said <br />it would be part of the building permit approval. <br />Vote: Ayes 5. Nays 0. <br />(#9) #2248 - DAVID AND JODI RAHN, 1385 REST POINT ROAD - VARIANCE <br />PUBLIC HEARING 8:40-9:02 P.M. <br />The Affidavit of Publication and Certificate of Mailing were noted, <br />The Applicant was present. <br />Van Zomeren reported that the application is a proposal for construction of an addition to <br />an existing cabin to square off the residence and restore an existing deck and screen porch. <br />The .3 acre property is located in the one acre zoning district. The structure is locate m <br />the 0-75' setback. A hardcover variance is required to increase the hardcover Ifom 9,^ to <br />19%. Lot area and lakeshore setback variances are required A conditional use pemut for <br />land alteration is required for any alteration or excavation in the flood plain and 0-75’ <br />setback from the shoreline. Van Zomeren reviewed the topography of the property notmg <br />that the shoreline contour is at the 924.9* elevation. The 930* contour tbUows the <br />lakeshore; the 932' contour traverses the property, so the middle portion of the lot is <br />considered to be in the flood plain. The concern is where the 931.5' elevation is located. <br />The applicant said he has lived on WUdhurst Trail s'mee 1975. He noted that the five other <br />homes west of this property is evenly setback as proposed for this residence. <br />There were no public comments. <br />Stoddard inquired what the Watershed District’s comments were. Rahn said the <br />Watershed did not require any mitigation for the entiy, deck, and screen porch as there are <br />on post footings. Stoddard suggested relocating the structure to lessen the variances <br />required. Rahn said his history as a contractor and building official relates to his desire to <br />restore the cabin with the addition to square it off and has not considered relocation; more <br />flood plain mitigation would be required, and its present location is the high spot on the <br />property. He would like to maintain the character of the property. He noted that m order <br />to move the structure behind the 75 ’ setback would require use of a holding area in that <br />setback. Stoddard noted that mitigation can occur elsewhere.