59 Remove and replace wood or chain link fence LF 300 16.00 4,800.00 1730 5.250.00 16.80 5,040.0060 Remove and transplant bushes EA 40 50.00 2,000.00 35.00 1,400.00 56.10 2.244.0061 Remove and transplant tree - Desiduous EA 15 300.00 4^00.00 250.00 3,750.00 224.40 3,366.0062 Remove and transplant tree - Coniferous EA 15 300.00 4,500.00 250.00 3.750.00 224.40 3,366.00Total Part 2 - Restoration 160,182.00 203.762.20 223,922.06Total Part 1 - Sanitary Sewer 363,558.00 369.534.25 443.930.62Total Part 2 - Restoration 160,182.00 203.762.20 223.922.06
<br />Total Base Bid 523,740.00 573.296.45 667,852.68
<br />Alternate No. 1 • Lift Station Knocking
<br />Add!
<br />63 Lift Station restocking fee LS 1 8,000.00 8.000.00 9,500.00 9,500.00 10,120.00 10,120.00
<br />Total Alternate No. 1 8,000.00 9.500.00 10,120.00
<br />Alternate No. 2 Did • Residental Submersible Grinder Station
<br />64 Residental simplex grinder pump stations EA 1 3.600.00 3,600.00 14300.00 14,500.00 6,391.70 6391.70
<br />Total Altemte No. 2 3,600.00 14.500.00 6,391.70
<br />Alternate No. 3 Bid • Directionai Bore 8'* HDPE, MH-1 to MH-!
<br />Add
<br />65 Diiecdonal bote 8* HDP. SDR 17 LF 1,010 90.00 90.900.00 57.48 58.054.80 78.20 78,982.00
<br />Dediict
<br />66 8* PVC, SDR 35,10’-12* deep LF 400 33.00 13,200.00 31.50 12.600.00 43.80 17,520.00
<br />67 8- PVC. SDR 35.12*. 14* deep LF 515 34.00 17,510.00 31.50 16,222.50 45.70 23335.50
<br />68 8- PVC, SDR 35,14’-16* deep LF 45 35.00 1,575.00 31.50 1,417.50 48.00 2,lo0.00
<br />69 8- PVC SDR 35.16’-18* deep LF 50 36.00 1.800.00 31.50 1.575.00 51.00 2,550.00
<br />70 Lightweight aggregate LF 1.010 :o.oo 30,300.00 0.01 10.10 43.30 43,733.00
<br />Total Deduct 64385.00 31.82^.10 89,498.50
<br />Total Alternate No. 3 $26,515.00 $26,229.70 ($10,516.50)
<br />Alternate Equipment Bids
<br />Item
<br />Manufacturer
<br />Deduct from Total Base Bid
<br />None None None
<br />Item
<br />Manufacturer
<br />Deduct from Total Base Bid
<br />None ‘4onc ‘^one
<br />13990.bC BT-3
<br />1
|