Laserfiche WebLink
23 3* X 45 degree HOPE bend24 8" X 4" PVC service wye branch25 8" X 2* wye26 4* PVC service pipe in place, SDR 2627 4* PVC service riser pipe in place, SDR 26 <br />28 4" HDPE service pipe directional bore <br />29 1-1/2 ” HDPE service pipe directional bore <br />30 Improved pipe fdn. in 6" increment depth <br />31 Mechanical trench compaction <br />32 Insolation <br />33 Sanitary sewer television inspection <br />34 Sttbmersible Pump Lift Station 1 <br />35 Submersible Pump Lift Station 2 <br />Total Part 1 - Sanitary Sewer <br />Part 2 • Restoration <br />36 Bituminous surfacing removal <br />37 Conunon excavation <br />38 Class5aggregatebase(100%crushed) <br />39 Type 31 bituminous base course <br />40 Type 41 A bituminous wearing course <br />41 Geoiextile fabric <br />42 Bituminous materia] for tack coat <br />43 Bituminous street patching <br />44 Clearing and grubbing <br />45 Sawcot bituminous <br />46 Bituminous driveway restoration <br />47 Concrete driveway restoration <br />48 27" diam. catch basin with casting <br />49 Remove existing CMP culvert <br />50 Furnish and install 15" CMP culvert <br />51 15" CMP flared end <br />52 Boulder retaining wall <br />53 Sod with 4" topsoil <br />54 Seed with topsoil, mulch and fertilizer <br />55 Erosion control fence <br />56 Wild flower seeding <br />57 Furnish and plant Evergreen Tree (Blue <br />Spruce) 6* high <br />58 Furnish and plant shade tree (Sugar Maple) <br />4" diameter <br />EA 5 30.00 150.00 49.50 247J0 30.20 151.00EA2230.00 660.00 42.50 935.00 59.40 1,306.80EA150.00 50.00 78.50 78J0 67.10 67.10LF85020.00 17.000.00 13.50 11,475.00 15.90 13,515.00LF3520.00 700.00 17J0 612.50 15.90 55630 <br />LF 300 24.00 7.200.00 27.87 8,361.00 34.90 10,470.00 <br />LF 120 24.00 2.880.00 28.30 3J96.00 33.50 4,020.00 <br />LF 1.950 3.00 5,850.00 0.01 19.50 3.40 6,630.00 <br />LF 1,950 1.00 1,950.00 3.25 6,337.50 0.11 214.50 <br />SY 20 20.00 400.00 17J0 350.00 19.60 392.00 <br />LF 4,075 0.60 2.445.00 0.45 1,833.75 1.10 4,482.50 <br />LS 1 40.000.00 40.000.00 61,500.00 61,500.00 47,991.70 47,991.70 <br />LS J 40,000.00 40.000.00 58.750.00 58,750.00 45.224.10 45.224.10 <br />363,558.00 369.534 25 443,930.62 <br />SY 4.000 IJO 6.000.00 3.50 14,000.00 1.70 6,800.00 <br />CY 2.100 3.50 1350,00 7.50 15,750.00 7.60 15.960.00 <br />TN 2,500 9.00 22300.00 12.50 31.250.00 14.60 36,500.00 <br />TN 600 28J0 17.100.00 30.80 18,480.00 31.90 19,140.00 <br />TN 600 29.00 17.400.00 31.90 19,140.00 34.90 20.940.00 <br />SY 4,700 1.25 5.875.00 1.50 7,050.00 1.10 5,170.00 <br />GL 300 1.20 360.00 1.10 330.00 1.80 540.00 <br />SY 700 6.75 4,725.00 11.00 7,700.00 19.70 13,790.00 <br />LS 1 5,000.00 5.000.00 9,750.00 9,750.00 7.293.00 7,293.00 <br />LF 100 6.00 600.00 5.50 550.00 2.20 220.00 <br />SY 600 6.75 4.050.00 8.75 5,250.00 20.20 12,120.00 <br />SF 100 10.00 1.000.00 5.50 550.00 6.20 620.00 <br />EA 1 1,000.00 1,000.00 1,375.00 1,375.00 1.102.30 1.102.30 <br />LF 150 5.00 750.00 15.50 2,325.00 12.00 1,800.00 <br />LF 150 20.00 3,000.00 24.50 3,675.00 25.90 3.885.00 <br />EA 4 150.00 600.00 225.00 900.00 200.70 802.80 <br />SF 80 14.00 1.120.00 28.50 2,280.00 44.90 3,592.00 <br />SY 13,000 2.0^26.000.00 2.45 31,850.00 2.80 36.400.00 <br />AC 0.4 3.280.00 1.312.00 3.608.00 1,443.20 4,712.40 1.084.96 <br />LF 1.000 2.00 2,000.00 2.50 2,500.00 2.00 2.000.00 <br />SF 800 030 240.00 0.58 464.00 0.34 272.00 <br />EA 20 220.00 4,400.00 325.00 6,500.00 280.50 5.610.00 <br />EA 20 600.00 12.000.00 325.00 6,500.00 673.20 13.464.00 <br />13990.bt BT-2