My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-1997 Council Packet
Orono
>
City Council
>
1997
>
06-09-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:07:47 PM
Creation date
7/31/2023 3:58:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Understanding <br />Ferndale Road from County Road 6 to Highway 12 has been slated for <br />reconstajctfon In 1998. The centerline for the majority of this <br />approximately one-mile long segment marks the boundaries between <br />the Cities of Orono and Plymouth. The City of Orono has requested that <br />the Qty of Plymouth act as the lead agency on this reconstruction <br />projea. <br />Ferndale Road is classified as a minor colieaor street In the Plymouth <br />Transportation Plan, its present width and Inadequate site distances <br />present safety issues that need to be addressed in the new design. <br />Ferndale will be reconstruaed as a nine-ton urban section roadway and <br />designed using Municipal State Aid standards. The road width will <br />provide for two lanes of traffic and a parking lane. A walking trail is to be <br />inciuded in the right-of-way along the east side. Sanitary sewer will be <br />fended from 12*^ Avenue to CSAH 6. A comprehensive drainage plan <br />for the trunk storm sewer will be completed. The storm sewer system <br />will be designed as part of this improvement project. <br />We see several issues as key to this projea. These are: <br />Transportation element — being able to accommodate traffic durina <br />construction <br />^ residents (public awareness during consrruaionj <br />► Storm drainage <br />► Sight distance correalons <br />Of these elements, communication with affeaed is a priority. Bonestroo <br />has extensive experience in this area and has several ideas for keeping <br />residents Informed of the project’s status. This pro-aaive approach often <br />results In increased public consensus and projea support. <br />This submittal provides a proposed scope of work for three distina <br />projea elements. These are: <br />► Preliminary engineering <br />► Design plans and specifications; contract bid assistance <br />► Construaion services <br />C/ly of Plymouth
The URL can be used to link to this page
Your browser does not support the video tag.