My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-1997 Council Packet
Orono
>
City Council
>
1997
>
04-14-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:26:20 PM
Creation date
7/31/2023 3:20:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 13, 1997 <br />Page 5 <br />#2212 Rebers - Preliminary Subdivision <br />The City's easement over Outlot D of Sugar Woods says that the City can't install a road in <br />Outlot D until a building permit has been issued for Outlot E (in which case only a segment <br />directly behind Outlot E is allowed to be constructed) or on Outlot F, in which case the road <br />may extend the full length of Outlot D. Also, that easement requires that any road built by <br />the City in Outlot D must have its southern edge abutting (or south oO the south boundary of <br />Outlot D, to protect the Sugar Woods residential development. <br />Development only within Outlot E, then, appears to allow the City to construct a 150' segment <br />of frontage road across the north side of Outlot E in Outlot D, but does not apparently trigger <br />or give the City the ability to develop the remaining portions of the frontage road further <br />eastward. And, the easem ’it over Otten's Outlot C appears to preclude its development as road <br />until the entire frontage road is built from Brown to Willow. A 150' segment of frontage road <br />at the rear of Outlot E with no clear indication of when that road will be completed, may be <br />less than desirable. <br />Access Impact on Development of Outlot E <br />Any business development within Outlot E will tend to be oriented toward the primary access <br />to the property. If the City intends to eventually eliminate direct access to current Highway <br />12 and have all access directed to a frontage road, as is indicated in the Comprehensive Plan, <br />then a developer of Outlot E might want to orient his building towards the future frontage road. <br />If the City cannot define when that frontage road will be developed, the developer's only <br />reasonable option is to orient his buildings to the southerly access. It may be possible for <br />certain types of businesses to be j ^mted such that access could come from either or both north <br />and south directions. The limitations on Outlot E's access due to the 1995-96 safety <br />improvements would suggest that a rrfrontage road access would be of benefit to Outlot E. <br />Since a semaphore currently exists at Willow, it would be appropriate from a traffic flow <br />standpoint to develop the service road westward from Outlot E to Willow Drive prior, to <br />development on Outlot E. <br />Additional Items of Note <br />The City's intent with this frontage road corridor was originally to have it also serve as a trail <br />corridor, hence a 60' right-of-way width was established rather than the normal 50'. A width <br />of 60' was platted in Outlot C of East W'illow Woods. However, Outlot D is 60' in width at <br />the west end but tapers to only 40' at its east end. At the east boundary of Outlot E, an <br />additional 7.05' of width is required in order to maintain a 60' width. This additional triangle <br />of right-of-way should be platted at this time, with road/utility/drainage easements granted. <br />The City Engineer has indicated that a drainage and utilities easement over Outlot D should <br />I <br />\
The URL can be used to link to this page
Your browser does not support the video tag.