My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-1997 Council Packet
Orono
>
City Council
>
1997
>
04-14-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:26:20 PM
Creation date
7/31/2023 3:20:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r- <br />April 7,1997 <br />To: Park Commission Members <br />From: Greg Gappa, Public Services Director ^ ^ <br />Subject: Antoine Park Playground Equipment Costs <br />We have received quotations and an equipment layout for Landscape Structures Equipment to be <br />installed by Earl F. Anderson Inc. This plan is the result of ideas from both tlie neighbor hood group <br />and the Park Commission. This layout idea was previously approved b} the Park Commission to be <br />located along the Fagemess Point street area of the park. TTiis location was selected to s ’.ow for <br />continued use of the level area, in front of the park buildings, for other purposes. <br />The Park Commission has had previous positive experiences with Landscape Structures Equipment <br />installed in Crystal Bay Park. This is high quality equipment and both the Public Works <br />Department and the Commission has been very satisfied with this equipment. For comparison <br />purposes, a price quotation was obtained for another brand of equipment, Columbia Cascade <br />Equipment installed by Park and Plaza Inc. <br />Landscape Structures Equipment $23,166 <br />Columbia Cascade Equipment $25,062 <br />Based on the price quotes received and past satisfaction with Landscape Structures equipment, the <br />staff recommendation is for the purchase and installation of Landscape Structures Equipment from <br />Earl F. Anderson Inc., Bloomington Minnesota. <br />Site grading will be required for installation of this equipment. Site grading will be completed by <br />Schoening Excavating of Maple Plain. This firm was the low bidder in the City's annual bidding <br />process for equipment rental and provision of construction materials, and is utilized for various small <br />construction projects throughout the year. Pea Gravel Surfacing in the playground area will be <br />installed by the public works department. A bituminous surface handicapped access path also needs <br />to be installed with additional rubber surfacing on a concrete base for handicapped access to the <br />playground equipment. <br />Site Excavation Cost <br />Pea Gravel Surfacing <br />Handicapped Access Costs <br />$5,100 <br />$2,000 <br />$3,000 <br />Total Estimated Costs $33,266
The URL can be used to link to this page
Your browser does not support the video tag.