Laserfiche WebLink
III. Sanitary Sewer <br />The proposed sanitary sewer for the Bracketts Point area is shown on Figure 2. A review of the <br />project site indicates the routes shown on the figures are recommended from a construction <br />standpoint. <br />The Bracketts Point area would be served by construction of a lift station located approximately 600 <br />feet south of County Road 15 on Bracketts Point Road. A force main would be installed along <br />Bracketts Point Road north to County Road 15 (Shoreline Drive) and connected to an existing MCES <br />force main. Gravity sewer will carry all flows to the lift station. <br />The property located on the east side of the project (see Figure 2, property 11) will need to be served <br />by a residential lift station due to the elevation of the existing structure. All other properties within <br />the project will have gravity services. <br />An alternate design for the sanitary sewer south of the proposed lift station is shown in Figure 3. <br />Properties in the south half of Bracketts Point would be served by individual grinder pumps. A force <br />main would be installed on the east side of the roadway north to the lift station. This alternate design <br />would decrease the initial cost of the project slightly. Grinder pump operation and maintenance <br />would be the responsibility of the property owner. A cost estimate for the alternate design is <br />included in the appendix. <br />Sewer service for each home will consist of a 4-inch PVC line. Services will be extended to the <br />property line. The property owners will be responsible for the connection to the service. The City <br />will provide a grinder pump station as part of the overall project cost for the property owners that <br />cannot be served by gravity. The installation of the grinder pump will be a responsiblity of the <br />property owner. <br />The project will generally be constructed within the right-of-way of existing streets where possible. <br />The alignments selected and shown on Figure 2 will require some permanent and temporary <br />easements to allow for construction. <br />The streets will be restored to 22 feet wide with 1 V2 inches of bituminous wear course, 2 inches of <br />bituminous base course, 8 inches of aggregate base, 100 % crushed material and geotextile <br />stabilization fabric. Detailed cost estimates for the sanitary sewer improvements are presented in <br />the Appendices. <br />Bracketts Point Sanitary Sewer Improvements