Laserfiche WebLink
II. Summary and Recommendations <br />The constniciion of sanitary sewer and force main to serve Bracketts Point area is feasible from an <br />engineering standpoint. The project is necessary because of the potential pollution problems to Lake <br />Minnetonka. The capital cost as well as operation and maintenance costs have been considered in <br />determining that the project is cost effective. The cost of these improvements are interrelated and <br />should be assigned equitably between all properties. The following recommendations are presented <br />for consideration by the Orono City Council: <br />1. <br />2. <br />3. <br />That this Report be adopted as the guide for installation of sanitary sewer in the <br />Bracketts Point area. <br />That the City conduct a legal and fiscal review of the proposed project prior to the <br />public hearing. <br />That a public hearing be held on the proposed improvements. The following <br />estimates should be used for hearing purposes: <br />Table 1. Cost Summary <br />Item Estimated Cost <br />Trunk Facilities $117,532 <br />Sanitary Sewer Laterals $141,894 <br />Street Surfacing $165,363 <br />Total $424,789 <br />There are 15 units proposed to be assessed for the trunk and lateral improvements. <br />Bracketts Point Sanitary Sewer Improvements