My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1997 Council Packet
Orono
>
City Council
>
1997
>
03-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:08:57 PM
Creation date
7/31/2023 3:05:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />Date: <br />Item No« • <br />\ <br />9>, %■ <br />\ % <br />. \ <br />5:6 <br />March 7;% <br />Department Approval <br />. Gaffron <br />Administrator Approval:Agenda Section: <br />Name: Michael P. <br />Title: Asst. Planning & Zoning Administrator <br />Item Description: Public Hearings - Bracketts Point and Bay Ridge/Hartwood Sewer Projects <br />List of Exhibits: <br />A - Notice/Letter/Maps Mailed to Affected Property (.Owners <br />B - City Administrator memo re: Hartwood trunk assessment options <br />C - Resolutions Ordering Preparation of Plans and Specifications <br />D - Feasibility Reports (February 1997) <br />These public hearings are required prior to directing the City Engineer to prepare plans and <br />specifications. These are the first formal public hearings on these two projects, although public <br />information meetings were held with the residents during 1995 and 1996. <br />As a result of the public information meetings, it appears to st.ifiThat there is general neighborhood <br />understanding of the background and need for sewer, therefore staff does not plan to make a detailed <br />presentation regarding the septic system conditions, etc. The City Engineer will make a presentation <br />of the feasibility report findings and recommendations regarding: <br />Recommended sewer system layout <br />Impacts to individual properties <br />Project costs <br />Schedule <br />The Engineer's presentation should be followed by a question and answer session open to the public. <br />Note that these are hq I assessment hearings, which are anticipated to be held in June after plans and <br />spec's have been accepted and bids received. The question of whether the Hartwood residents will <br />be assessed for trunk charges prior to lateral installation, remains to be answered prior to the June <br />hearings (See Exhibit B). <br />Bay Ridge / Hartwood Lift Station Location Issue <br />An additional issue for discussion is that the owner of the Hartwood property on which the lift <br />station is proposed. Mr. Boni, has strongly objected to having the lift station on his property, and <br />wants nothing to do with the sewer. He has a relatively new septic system and landscaping he <br />doesn't want disturbed. The City Engineer has indicated that relocating the lift station further north <br />onto the most southerly Bay Ridge property will result in higher future costs to ser\’e the Hartwood
The URL can be used to link to this page
Your browser does not support the video tag.