Laserfiche WebLink
The project Site contributes drainage to Long Lake. This water eventually makes its way to <br />Lake Minnetonka. The Site is located in the Minnehaha Creek Watershed District. Three <br />minor watershed areas drain through the Site and outlet into Long Lake. The watershed <br />boundaries extend north of the project area and include approximately 208 acres of off-site <br />drainage area. The runoff flows through the Site from the north to the south and outlets into <br />Long Lake through culverts under Spring Hill Road. <br />Considerable efforts have been made by the Minnehaha Creek Watershed District to improve <br />the water quality of Long Lake, with over $2.2 million spent in an effort in recent years. During <br />the design of the course, special attention has been, and will continue to be, given to <br />improving runoff quality from the present condition. The nutrient budget analysis indicates <br />significantly reduced levels from the existing condition (see Table 2). The stormwater <br />treatment ponds are intended to be constructed to treat the runoff from the golf course. The <br />runoff through the wetland complexes to Long Lake is routed through wet detention ponds <br />prior to discharge to Long Lake. The irrigation pond in the center drainage will collect runoff <br />for reuse as irrigation, thereby further reducing potential nutrient loading and reducing irrigation <br />needs. Since there is little impervious area and the flow must pass across well vegetated <br />grassy areas, it is anticipated that the golf course will not be a significant loading source. <br />Water quality and quantity control will be provided by three NURP basins designed for both <br />on-site and off-site drainage areas. The NURP basins are located along Spring Hill Road on <br />the upstream end of the existing culverts. Outlet structures are placed at the existing culverts <br />to control the flow rates. The ponds are sized to meet Minnehaha Creek Watershed District <br />and City requirements for NURP basin design. <br />The drainage ivas analyzed using stormwater modeling software based on Soil Conservation <br />Service methodologies. The modeling was set up to route 100-year, 10- year and 1-year <br />design storms through the existing wetlands, mitigation wetlands, NURP basins and road <br />culverts. <br />The proposed construction of the fairways, greens and tees will increase the volume of runoff <br />by 120% to 175% over the existing conditions. By using the detention storage available in the <br />wetlands, mitigation areas and NURP basins, the additional volume is controlled and the <br />proposed runoff rates leaving the Site are reduced to below the existing rates. <br />The existing and proposed runoff rates at the three major culvert crossings on Spring Hill Road <br />are presented in Table 1. <br />TABLE 1 <br />RUNOFF RATES TO LONG LAKE <br />: SPRING HILL RD <br />CULVERT <br />EXISTING CONDITIONS PROPOSED CONDITIONS <br />100 Yr.10 Yr.1 Yr.100 Yr. 10 Yr.1 Yr. <br />15" CMP (NURP Basin 1)23cfs 9 cfs 0 cfs 4 cfs 2 cfs 0.2 cfs <br />36" RCP (NURP Basin 2)23cfs 11 cfs 1 4 cfs ■>6.5 cfs 11.5 cfs 0.4 cfs